108
P9 ASD Installation and Operation Manual
V/I Input Point 1 Rate
Program
Torque
Setpoints
This parameter is used to set the gain and bias of the isolated
V/I
input terminal
when the
V/I
terminal is used as the control input while operating in the
Torque
Control
mode.
V/I Input Torque Control Setup
Perform the following setup to allow the system to receive
Torque Control
input at the
V/I
input terminal:
• Set
of the
Terminal Board
to
Voltage
or
Current
• Program
Fundamental
Standard Mode Selection
Frequency Mode 1
V/I
.
• Program
Fundamental
Standard Mode Selection
Command Mode
Selection
Terminal Block
.
Torque Control
Perform the following setup to allow the system to perform
Torque Control
from the
V/I
input terminal:
• Set
V/I Input Point 1 Rate
).
• Set
V/I Input Point 1 Setting
(
) — the input analog signal level that
corresponds to the torque setting at
V/I Input Point 1 Rate
.
• Set
V/I Input Point 2 Rate
).
• Set
V/I Input Point 2 Setting
(
) — the input analog signal level that
corresponds to the torque setting at
V/I Input Point 2 Rate
.
• Provide a
Run
command (
F
and/or
R
).
Torque Control is accomplished by establishing an associated
V/f
output pattern
for a given
V/I
input level.
Once set, as the
V/I
input voltage changes or the
V/I
current changes, the
output torque of the ASD will vary in accordance with the above settings.
This parameter sets
V/I Input Point 1 Rate
and is the output torque value that
is associated with the setting of
V/I Input Point 1 Setting
when operating in
the
Torque Control
mode.
This value is entered as 0% to 250% of the rated torque.
Note:
When using the isolated
V/I
input terminal, the
IICC
terminal
must be used as the return (negative) connection.
Direct Access Number — F205
Parameter Type —
Numerical
Factory Default —
0.00
Changeable During Run —
Yes
Minimum — 0.00
Maximum — 250.00
Units — %
Torque Settings
Содержание P9
Страница 1: ...TM P9 ASD Install Op Manual TOSHIBA P9 ASD INSTALLATION OPERATION MANUAL DN 64054 004 February 2013 ...
Страница 2: ......
Страница 3: ...Document Number 64054 004 February 2013 P9 ASD Installation Operation Manual TM ...
Страница 4: ......
Страница 280: ...270 P9 ASD Installation and Operation Manual Figure 38 See Tables 17 and 18 for Actual Dimensions ...
Страница 281: ...P9 ASD Installation and Operation Manual 271 Figure 39 See Tables 17 and 18 for Actual Dimensions ...
Страница 282: ...272 P9 ASD Installation and Operation Manual Figure 40 See Tables 17 and 18 for Actual Dimensions ...
Страница 285: ...P9 ASD Installation and Operation Manual 275 Figure 43 See Table 18 for the associated device Dimensions are in in cm ...
Страница 304: ...294 P9 ASD Installation and Operation Manual W W T3 16 Warranty Card 2 W Phase Over Current 265 ...
Страница 305: ......