P9 ASD Installation and Operation Manual
Electronic Operator Interface
The P9 ASD
Electronic Operator Interface
(EOI) is comprised of an LED screen, an LCD screen, two
LEDs, a rotary encoder, and five keys. These items are shown and described on
.
EOI Operation
The
EOI
is the primary input/output device for the user. The
EOI
may be used to monitor system
functions, input data into the system, perform diagnostics, and view performance data (e.g., motor
frequency, bus voltage, torque, etc.).
The software used with the P9 ASD is menu driven; thus, making it a select and click environment. The
operating parameters of a motor may be selected and viewed or changed using the
EOI
(or via
communications).
Battery Backup
The EOI is equipped with a battery backup system. The function of the backup system is to retain the EOI
SRAM programming in the event of a power outage, or if an EOI removal and installation from one
system to another is required without the loss of programming.
Listed below are the items retained by the battery backup system:
EOI
Information,
,
Information,
Information,
Items,
Items, and
Information (parameter settings may be saved by the user).
The battery backup system must be activated by the installer or maintenance personnel to use the backup
function.
To activate the battery backup system, remove the Phillips screw from the front of the LED/LCD display
unit. Remove the LED/LCD display unit from the ASD. From the circuit side of the display unit, remove
the jumper at
J1
, pins
2
and
3
. Place the jumper at
J1
, pins
1
and
2
.
The expected battery life cycle is four and a half years.
Note:
The Battery backup system does not supply power to the LED/LCD display.
LED/LCD Screen Installation Note
When installing the LED/LCD display unit of the EOI, ensure that the left side of the display is inserted
first with the top and bottom catches (see Phillips screws at underside of display) securely in place. This
ensures the proper alignment and electrical connection of the CNX connector of the LED/LCD display
unit PCB. Gently hold the display in place while securing the Phillips mounting screw.
If improperly seated, the periphery of the LED/LCD display unit will not be flush with the EOI surface
and the unit will not function properly.
Содержание P9
Страница 1: ...TM P9 ASD Install Op Manual TOSHIBA P9 ASD INSTALLATION OPERATION MANUAL DN 64054 004 February 2013 ...
Страница 2: ......
Страница 3: ...Document Number 64054 004 February 2013 P9 ASD Installation Operation Manual TM ...
Страница 4: ......
Страница 280: ...270 P9 ASD Installation and Operation Manual Figure 38 See Tables 17 and 18 for Actual Dimensions ...
Страница 281: ...P9 ASD Installation and Operation Manual 271 Figure 39 See Tables 17 and 18 for Actual Dimensions ...
Страница 282: ...272 P9 ASD Installation and Operation Manual Figure 40 See Tables 17 and 18 for Actual Dimensions ...
Страница 285: ...P9 ASD Installation and Operation Manual 275 Figure 43 See Table 18 for the associated device Dimensions are in in cm ...
Страница 304: ...294 P9 ASD Installation and Operation Manual W W T3 16 Warranty Card 2 W Phase Over Current 265 ...
Страница 305: ......