102
P9 ASD Installation and Operation Manual
V/f 5-Point Setting Frequency 1
Program
Special
V/f 5-Point Setting
The
V/f 5-Point Setting Frequency 1
setting establishes the frequency that is
to be associated with the voltage setting of
(V/f 5-Point Setting Voltage
1).
The V/f 5-Point settings define a volts per hertz relationship for the startup
output of the ASD.
To enable this function, set the
V/f Pattern
) selection to the
V/f 5-Point
Curve
setting.
V/f Curves
may be useful in starting high inertia loads such as rotary drum
vacuum filters.
Direct Access Number — F190
Parameter Type —
Numerical
Factory Default —
0.00
Changeable During Run —
No
Minimum — 0.00
Maximum — Maximum Freq. (
Units — Hz
Содержание P9
Страница 1: ...TM P9 ASD Install Op Manual TOSHIBA P9 ASD INSTALLATION OPERATION MANUAL DN 64054 004 February 2013 ...
Страница 2: ......
Страница 3: ...Document Number 64054 004 February 2013 P9 ASD Installation Operation Manual TM ...
Страница 4: ......
Страница 280: ...270 P9 ASD Installation and Operation Manual Figure 38 See Tables 17 and 18 for Actual Dimensions ...
Страница 281: ...P9 ASD Installation and Operation Manual 271 Figure 39 See Tables 17 and 18 for Actual Dimensions ...
Страница 282: ...272 P9 ASD Installation and Operation Manual Figure 40 See Tables 17 and 18 for Actual Dimensions ...
Страница 285: ...P9 ASD Installation and Operation Manual 275 Figure 43 See Table 18 for the associated device Dimensions are in in cm ...
Страница 304: ...294 P9 ASD Installation and Operation Manual W W T3 16 Warranty Card 2 W Phase Over Current 265 ...
Страница 305: ......