63 03 452 D3352
D3352
.
031.05.08
.
02 10.2015
53
Sirona Dental Systems GmbH
5 Installation: X-ray unit
Installation Manual ORTHOPHOS XG 3D / Ceph
5.4 Installing the floor stand (option 2)
båÖäáëÜ
Setting up and leveling the unit
Setting up the unit and leveling the floor stand installation: XG 3 / 5 / 3D / 3D ready
1. Insert screw (P) through the washer and then from the rear through
the support and into the stand.
2. Fit profile clamp (Q) onto screw (P) from the other (front) side and
screw nut (R) onto screw (P).
3. Tighten adjusting nuts (O) and screw (P) firmly.
4. Set up the unit including the center styrofoam part.
5. Remove the styrofoam packaging and rotate the X-ray tube assembly
counterclockwise to the front side of the unit.
R
Q
P
P
1x Ø 10,5
1x M10x50
Q
1x M1
0
1x
R
IMPORTANT
Observe the required movement range of the unit during installation.
Содержание Orthophos XG 3D/Ceph
Страница 1: ...k W f j NMKOMNR loqelmelp ud Pa L b b Cover page...
Страница 2: ......