63 03 452 D3352
D3352
.
031.05.08
.
02 10.2015
47
Sirona Dental Systems GmbH
5 Installation: X-ray unit
Installation Manual ORTHOPHOS XG 3D / Ceph
5.3 Wall mounting (standard and option 1)
båÖäáëÜ
Leveling the unit and fastening it to the floor (standard and option 1)
Aligning and fastening the unit: XG 3 / 5 / 3D / 3D ready
1. Remove the transport safety device (G).
2. Pull wooden board (H) out of the styrofoam packaging and remove all
styrofoam packaging.
3. Rotate the X-ray tube assembly counterclockwise to the front side of
the unit.
4. Level the unit in both directions with the help of the spirit level by
adjusting the unit base:
Align the stand by placing the spirit level on the side and rear of the
stand (I).
Align the ring in both directions using the spirit level by placing the
spirit level on the ring (J).
G
H
H
H
H
Содержание Orthophos XG 3D/Ceph
Страница 1: ...k W f j NMKOMNR loqelmelp ud Pa L b b Cover page...
Страница 2: ......