63 03 452 D3352
D3352
.
031.05.08
.
02 10.2015
185
Sirona Dental Systems GmbH
12 Startup, measurements and tests (for USA/Canada only)
Installation Manual ORTHOPHOS XG 3D / Ceph
12.7 Checking the tube current
båÖäáëÜ
12.7
Checking the tube current
Preparing the measurement
1. Switch off the unit (see Operating Instructions).
DANGER! After switching off the unit, wait at least 4 minutes (LED
V500 on the DX6 must no longer be on) before removing the cover
on the tube assembly.
2. Loosen the 3 screws (D) and remove the lid of the tube assembly
cover (E).
3. Loosen the 4 screws (F) and remove the cover plate (G).
NOTICE
Damage to the measuring unit
The ring assembly and the tube assembly move during the
measurement.
Make sure that the measuring wires are sufficiently long to allow for the
ring movement and that the measuring unit is in a secure position so that
it will not fall down.
E
D
D
D
F
G
Содержание Orthophos XG 3D/Ceph
Страница 1: ...k W f j NMKOMNR loqelmelp ud Pa L b b Cover page...
Страница 2: ......