63 03 452 D3352
46
D3352
.
031.05.08
.
02 10.2015
5 Installation: X-ray unit
Sirona Dental Systems GmbH
5.3 Wall mounting (standard and option 1)
Installation Manual ORTHOPHOS XG 3D / Ceph
Mounting the unit on the wall holder (standard and option 1)
Note on moving the unit by the bar: XG 3 / 5 / 3D / 3D ready
1. Move the unit into its installation position against the wall. Hold the
unit laterally at the styrofoam packaging to do this.
2. Place screws (A) in the grooves.
3. Screw the unit firmly onto the wall holder using nuts and washers (B).
The wall holder must be flush with the upper edge of the unit.
The unit is now mounted on the upper wall holder.
4. Insert screw (C) through washer (D) and then through the wall holder
and into the stand from behind.
5. Fit profile clamp (E) onto screw (C) from the other (front) side and
screw nut (F) onto the screw.
6. Tighten nut (F) firmly.
NOTICE
Possible transport damage
Leave the middle styrofoam packaging on the unit throughout the entire
installation.
If, due to on-site conditions, it is necessary to remove the styrofoam
packaging at this point, move the unit
carefully
by grasping the bite block
bar and the stand.
2x M 8
2x Ø 8,4
2x M 8x30
A
B
1x Ø 8,4
1x M 8x50
C
D
1x M 8
1x
E
F
Содержание Orthophos XG 3D/Ceph
Страница 1: ...k W f j NMKOMNR loqelmelp ud Pa L b b Cover page...
Страница 2: ......