Installation Training 

I-6800-39 

Содержание FLX

Страница 1: ...Installation Training I 6800 39...

Страница 2: ...Installing the FLX There are two methods used for shipping the unit assembled and non assembled We will focus on the non assembled method first...

Страница 3: ...n assembled Setup 1 With the help of an assistant install the lower plate under the two leg assemblies as shown 2 Attach with mounting hardware four SHCS 1 4 20 x 5 long with1 4 split washers both sid...

Страница 4: ...x mounting screws 4 With an assistant lift overhead into place on top of leg assemblies WARNING This scanner requires a two person lift Failure to comply may cause bodily injury Two adults are require...

Страница 5: ...he pins on rear of the overhead are seated into the holes on leg assemblies 6 When seated properly overhead locks into place To ensure safety the overhead should still be supported by an assistant unt...

Страница 6: ...7 From rear of scanner secure overhead with mounting hardware two SHCS1 4 20 x 5 8 long with 1 4 split washers both sides...

Страница 7: ...n 10 Run the tape diagonally to the upper open corner as shown and record the measurement Measurement should be approximately 65 3 8 166cm 11 Take the same measurement on the opposite corners and reco...

Страница 8: ...12 From top of scanner secure overhead with mounting hardware two SHCS 1 4 20 x 5 8 long with 1 4 split washers both sides...

Страница 9: ...ove the glides 15 Position patient chair on gantry base Ensure base frame centering screw is seated within patient chair centering block 16 Loosely secure patient chair to gantry 4 bolts Do not tighte...

Страница 10: ...our long screws from red shipping plate Keep shipping plate attached with remaining hardware Do NOT discard mounting hardware Long screws used for receptor assembly mounting and short screws for sourc...

Страница 11: ...gning the mounting pins 21 Attach assembly with four long mounting screws acquired from red shipping plate Once secured remove remaining screws from shipping plate and save for later use Remove shippi...

Страница 12: ...red white connector through brackets and connect to other red white connector 24 Feed second gray wire through brackets and connect the red black wires with white connectors 25 Connect together the gr...

Страница 13: ...26 Connect grey wire with green connector to assembly Run wire behind motor as shown...

Страница 14: ...ng cover outward to remove 28 Feed LEMO connector through hub and plug into panel Rotate red dot on connector to the 3 o clock position Slide connector into receptor until it snaps in place 29 Feed gr...

Страница 15: ...r 32 Attach mounting screws 33 Locate X ray source assembly and remove from packing material 34 Place assembly on clean surface Remove and set aside the magnetic mounted X Ray source window panel from...

Страница 16: ...36 Detach outer cover ONLY 37 Carefully detach and move inner source cover a few inches away from assembly 38 Remove ribbon cable from beam limiter assembly by pressing connector locking tab...

Страница 17: ...39 Using very little force slowly rotate gantry counterclockwise Stop the rotation when you feel that the gantry is at the limit switch position 40 Slide inner source cover onto the gantry overhead...

Страница 18: ...emoved from red shipping plate along with four split washers 43 Draw the 3 cables out through the opening Ensure that the cables are not stretched or damaged 44 Record label information that is requir...

Страница 19: ...ounting nut and installing lug over the star lock washer Replace mounting nut 46 Attach together black cables with the two connectors 47 Attach grey wire with red white connector as shown Ensure red s...

Страница 20: ...er assembly 49 Slide inner source cover into place onto top mounting notches 50 Mount outer cover onto mounting notches over panel cover 51 Attach covers with hex mounting screws at top and bottom qua...

Страница 21: ...pproximately 66 5 to 68 inches 169 to 173 cm from the floor to the center of the mounting bar 54 Use 3 wall anchors screws to mount the bar securely to the wall The type and length of mounting hardwar...

Страница 22: ...1518 Control Box connector on rear of overhead panel Connectors are keyed to prevent improper insertion For wall mounting options see Wall Mount Control Box chapter 58 Connect shorting plug to 1525 do...

Страница 23: ...atient chair connector Connectors are keyed to prevent improper insertion Rotate red emergency stop button to verify that it is disengaged 62 Connect power cable to AC POWER IN connector on rear of ov...

Страница 24: ...64 Connect power cable to hospital grade receptacle 65 To ensure that the device cabling does not interfere with the rotation of the gantry use Cable Clips to dress cabling as shown...

Страница 25: ...adapter 4 Set power switch at rear of scanner controller to 1 on This does NOT power on the device Peripheral devices will be powered on later in the workflow CAUTION To assure proper Ethernet communi...

Страница 26: ......

Страница 27: ...Level Gantry To achieve optimal performance it is imperative that the gantry be properly leveled 1 Scanner must be leveled from side to side and front to back...

Страница 28: ...el overhead gear by manually adjusting the front gantry feet 3 Adjust the rear gantry feet using the 1 2 open ended wrench NOTE Ensure levelness of overhead gear is measured front to back and side to...

Страница 29: ...4 Store red shipping bracket in overhead 5 Replace shielding cover...

Страница 30: ...6 Replace top cover 6 screws 7 Now that the scanner is positioned and leveled tighten wall bracket at top rear of gantry 8 Switch the power circuit breaker located on the overhead rear panel to l on...

Страница 31: ...er power button in front and touch screen power button on right side NOTE If at any time the Ethernet cable connecting the scanner to the scanner controller becomes disconnected reconnect the cable an...

Страница 32: ...Physical Installation Complete...