122
6.
Set the module parameter by referring to the following.
7.
Click the [Refresh Parameters] button to display the refresh parameter setting window.
8.
Set the refresh parameter. Change the value if necessary.
9.
Write the set parameter to the CPU module of the master station and reset the CPU module.
10.
Change the state of the CPU module of the master station to RUN.
The network configuration setting is now completed.
RESET
RUN
Содержание NZ2GF2B-60TCRT4
Страница 1: ...CC Link IE Field Network Temperature Control Module User s Manual NZ2GF2B 60TCTT4 NZ2GF2B 60TCRT4 ...
Страница 2: ......
Страница 86: ...84 Memo ...
Страница 233: ...231 CHAPTER 8 FUNCTIONS 8 8 4 CC Link IE Field Network Function 3 Click the OK button on the following window ...
Страница 268: ...266 Memo ...
Страница 377: ...375 APPENDICES A Appendix 6 External Dimensions Memo ...
Страница 383: ...I 4 4 7 8 381 Memo ...
Страница 387: ......