APPENDIX
App. - 18
App. 4.9 Check list for user documentation
MR-J4 installation checklist for manufacturer/installer
The following items must be satisfied by the initial test operation at least. The manufacturer/installer must
be responsible for checking the standards in the items.
Maintain and keep this checklist with related documents of machines to use this for periodic inspection.
1. Is it based on directive/standard applied to the machine?
Yes [ ], No [ ]
2. Is directive/standard contained in Declaration of Conformity (DoC)?
Yes [ ], No [ ]
3. Does the protection instrument conform to the category required?
Yes [ ], No [ ]
4. Are electric shock protective measures (protective class) effective?
Yes [ ], No [ ]
5. Is the STO function checked (test of all the shut-off wiring)?
Yes [ ], No [ ]
Checking the items will not be instead of the first test operation or periodic inspection by professional
engineers.
Содержание MR-J4
Страница 9: ...A 8 MEMO ...
Страница 19: ...10 MEMO ...
Страница 73: ...1 FUNCTIONS AND CONFIGURATION 1 54 MEMO ...
Страница 155: ...3 SIGNALS AND WIRING 3 76 MEMO ...
Страница 199: ...4 STARTUP 4 44 MEMO ...
Страница 289: ...6 NORMAL GAIN ADJUSTMENT 6 24 MEMO ...
Страница 335: ...8 TROUBLESHOOTING 8 8 MEMO ...
Страница 357: ...9 OUTLINE DRAWINGS 9 22 MEMO ...
Страница 517: ...12 ABSOLUTE POSITION DETECTION SYSTEM 12 30 MEMO ...
Страница 617: ...16 USING A DIRECT DRIVE MOTOR 16 20 MEMO ...
Страница 641: ...17 FULLY CLOSED LOOP SYSTEM 17 24 MEMO ...
Страница 725: ...18 MR J4 03A6 SERVO AMPLIFIER 18 84 MEMO ...
Страница 763: ...APPENDIX App 38 ...
Страница 789: ...MEMO ...
Страница 793: ......