
Maintenance
306
Pos: 98.23 /Ü berschriften/Ü berschriften 2/A-E/AAnheben @ 33\mod_1254380091415_78.docx @ 319041 @ 2 @ 1
20.5
Lifting
Pos: 98.24 /BA/War tung/AnhebenAnheben Bil d BiG PAC K 870 HD P @ 309\mod_1417511485012_78.docx @ 2396278 @ @ 1
BPHS0318
RH+LH
942 012- 1
RH+LH
942 012- 1
Fig. 223
RH = right-hand side of the machine
LH = left-hand side of the machine
Pos: 98.25 /BA/Sicherheit/8. Voraussetzungen/Handlungsanweisung für all e M aschinen/Handlungsanweisung: M aschine stillsetzen und sichern @ 274\mod_1404365253849_78.docx @ 2065151 @ @ 1
• Shut down and safeguard the machine, see chapter Safety -> Safety routines, "Shutting
down and safeguarding the machine".
Pos: 98.26 /BA/War tung/Anheben/Anheben der M aschine BiG Pack @ 280\mod_1405587188041_78.docx @ 2156401 @ 33 @ 1
20.5.1
Eyebolts for lifting
The baler is fitted with four eyebolts for lifting:
– Two eyebolts are located in the front area of the drawbar (1), on the right and left side of the
machine.
– Two eyebolts are located at the rear at the yoke (2), on the right and left side of the
machine.
20.5.2
Lifting
Before lifting, make sure that
– the flywheel brake is applied.
– the parking support (support jack) is in the transport position.
– the roller chute (bale chute) is folded in.
– the pick-up is raised
– the self-steering axle is locked, optional.
– all safety devices are locked.
– the lifting beams have a minimum load-bearing capacity, depending on the permitted gross
weight of the machine.
Weight of the machine, see chapter Description of machine "Technical Data".
• Attach the chains on the lifting beams to the four eyebolts on the baler.
Make sure that the chain hooks are correctly placed on the stop points.
Pos: 98.27 /Layout Module /---------------Seitenumbr uch---------------- @ 0\mod_1196175311226_0.docx @ 4165 @ @ 1
Содержание 870 HDP
Страница 380: ...FLUFXLW GLDJUDP 1 LJ3DFN EDOHU L 3 LJK 6SHHG 3 ...