PAT-T 4KW
7-39
7
Remot
e
Cont
ro
l
Parameter
Val
u
e:
ON(1)
Auto continue mode on
OFF(0)
Auto continue mode off (default)
For the setting that is applied when *RST is sent, see Table A-16.
Response
Returns the sequence operation auto continue mode setting in the NR1 form in
response to INIT:CONT:SEQ3? / INIT:CONT:NAME ACQ.
Clearing the measurement data
SENS:AVER:CLE
It clears all the measurement data (The mean value data: the moving average
deviations of 64 times measured in every 4 ms) stored in the measurement data
cache, and the measurement data after 256 ms (New moving average created by
another 64 times) becomes valid.
When the data is acquired while varying the setting of the voltage or the current,
transmit the "SENS:AVER:CLE" command after setting the voltage or the current.
The measurement data becomes valid after 256 ms upon receipt of the command.
Command
SENSe:AVERage:CLEar
Measurement operation
If the measurement is not complete immediately after sending the INIT:SEQ3 /
INIT:NAME ACQ command or immediately after a MEAS query, the response
data is generated after the measurement for the FETC or MEAS query is complete.
■
FETCh query
FETC? queries the measured data without starting the measurement operation.
If FETC? is sent without making a single measurement after resetting the PAT
(using *RST) or after switching from local mode (panel operation) to remote
mode, an SCPI error (-230,“Data corrupt or stale”) occurs. This is because there
is no valid measured data that is held. Be sure to use this command after the INIT
or MEAS command.
■
MEASure query
Queries the measured data after starting a new measurement operation.
MEAS? is equivalent to combining the INIT command and FETC? query.
See
Содержание PAT160-25T
Страница 17: ...General Description This chapter describes an overview and describes the features...
Страница 22: ...1 6 PAT T 4kW...
Страница 34: ...2 12 PAT T 4kW...
Страница 73: ...External Control This chapter describes external analog control and remote monitoring using the J1 connector...
Страница 106: ...6 12 PAT T 4kW...
Страница 158: ...7 52 PAT T 4KW...
Страница 159: ...Maintenance This chapter describes maintenance such as cleaning inspecting and calibrating...
Страница 171: ...Specifications This chapter describes the specifications and gives the dimensions of the PAT...