PAT-T 4kW
6-7
6
P
a
rall
el/S
erie
s Opera
ti
o
n
Setting the voltage and current
The voltage and current are set on the master unit. The total value of the master and
slave units are delivered for the current.
When the setting number of units is set by the config setting (CF24) under the
master-slave parallel operation, the maximum output current value (Three-phase
input mode : 105 % of the rating of the single unit X number of units connected in
parallel operation, Single-phase input mode : 105 % of the rating of the single unit
X number of units connected in parallel operation X 75 %) is set, and it's value will
be displayed when it is set to the setting value display (lights up the SET key). The
voltage value is set with the last setting of the master unit. When the OUTPUT
switch is pressed with keeping this condition, its setting value will be output. Set the
value as desired.
Setting the overvoltage protection (OVP) and overcurrent
protection (OCP) of the master unit
Use the master-slave parallel operation, set the overvoltage protection (OVP) and
overcurrent protection (OCP) of the master unit.
When the setting number of units is set by the config setting (CF24) under the
master-slave parallel operation, the maximum over current protection value (Three-
phase input mode : 111.5 % of the rating of the single unit X number of units
connected in parallel operation, Single-phase input mode : 111.5 % of the rating of
the single unit X number of units connected in parallel operation X 75 %) is set, and
it's value will be displayed when it is set to the OPV/OCP setting value display
(lights up the OVP/OCP key). The value of over voltage protection is set with the
last setting of the master unit.
CONFIG parameters that can be set on the slave unit
•
CF13
Error message display setting
•
CF23
Status signal setting of the power on/off
•
CF26
Master-slave parallel setting
•
CF27
Breaker trip setting when the shutdown signal is applied
•
CF28
Breaker trip setting when the OVP or OCP is activated
•
CF40 to CF43
RS232C settings
•
CF51
GPIB address setting
6.1.4
Starting the Master-Slave Parallel Operation
Turning the power on
1
T
u
rn on the POWER s
w
itch of the slave
u
nits.
2
T
u
rn on the POWER s
w
itch of the master
u
nit.
See
See
See
Содержание PAT160-25T
Страница 17: ...General Description This chapter describes an overview and describes the features...
Страница 22: ...1 6 PAT T 4kW...
Страница 34: ...2 12 PAT T 4kW...
Страница 73: ...External Control This chapter describes external analog control and remote monitoring using the J1 connector...
Страница 106: ...6 12 PAT T 4kW...
Страница 158: ...7 52 PAT T 4KW...
Страница 159: ...Maintenance This chapter describes maintenance such as cleaning inspecting and calibrating...
Страница 171: ...Specifications This chapter describes the specifications and gives the dimensions of the PAT...