PAT-T 4kW
8
-9
8
Mai
n
te
nance
Calibration procedure of the output voltage control using
external voltage (CAL.5)
Fig.
8
-9
Connection for CAL.5
1
T
u
rn the POWER s
w
itch off.
2
Connect the voltage so
u
rce (Vref) to pins 21 and 22 of the J1
connector.
3
While holding do
w
n the SET key, t
u
rn on the POWER s
w
itch.
Keep holding the SET key until the ammeter is showing “CAL.1,” and the voltmeter is
showing 5 % of the rated voltage value. Warm up the PAT for at least 30 minutes.
4
Press the CO
N
FIG key.
The ammeter shows “CAL.5,” and the voltmeter shows “0.000.”
5
Set Vref to 0.000 V.
6
Press the RECALL A (SHIFT+SET) key.
The calibration of the low end of the EXT CV CONT is set, and the LOCK LED
illuminates.
7
Press the CO
N
FIG key.
The ammeter shows “CAL.5,” and the voltmeter shows “10.00.”
8
Set Vref to 10.00 V.
9
Press the RECALL A (SHIFT+SET) key.
The calibration of the high end of the EXT CV CONT is set, and the EXT LED
illuminates.
Then, the LOCK LED and EXT LED turn off, and the PRESET A LED illuminates.
10
T
u
rn the POWER s
w
itch off to finish the calibration of the o
u
tp
u
t voltage
control
u
sing external voltage.
V
ref
+
–
2-core shielded or
twisted-pair wire
21
22
25
26
21
22
1 2
J1
Output terminal
Chassis terminal
PAT
J1
Содержание PAT160-25T
Страница 17: ...General Description This chapter describes an overview and describes the features...
Страница 22: ...1 6 PAT T 4kW...
Страница 34: ...2 12 PAT T 4kW...
Страница 73: ...External Control This chapter describes external analog control and remote monitoring using the J1 connector...
Страница 106: ...6 12 PAT T 4kW...
Страница 158: ...7 52 PAT T 4KW...
Страница 159: ...Maintenance This chapter describes maintenance such as cleaning inspecting and calibrating...
Страница 171: ...Specifications This chapter describes the specifications and gives the dimensions of the PAT...