PAT-T 4kW
4-19
4
B
a
s
ic O
p
er
a
ti
on
CF22 External control logic setting of the output on/off
Sets the logic used to control the output on/off using an external contact (J1
connector). Cannot be set when the output is on.
Select “H” when not controlling the output on/off with an external contact.
CF23 Status signal setting of the power on/off
Sets whether to output a low level signal while the power is on or off when
monitoring the power on/off status externally (through the J1 connector). The
setting is possible even when the product is used as a slave unit.
CF24 Setting the number of units in Master-Slave Parallel Operation
Sets the total number of units which consists of the master unit and the slave units
under the Master-Slave Parallel Operation. However, it can not be set when the
output is turned on.
CF25 Output status setting at power-on
Sets the output state when the POWER switch is turned on. This setting is invalid
when the output is turned off using an external contact.
CF26 Master-Slave parallel operation setting
Sets the PAT condition during master-slave parallel operation. Cannot be set when
the output is on. The setting is possible even when the product is used as a slave
unit.
See
Settings
Description
H
T
u
rn the o
u
tp
u
t on
w
ith a high signal (factory defa
u
lt)
L
T
u
rn the o
u
tp
u
t on
w
ith a lo
w
signal
See
Settings
Description
0
O
u
tp
u
t a lo
w
level signal
w
hile the po
w
er is on (factory defa
u
lt)
1
O
u
tp
u
t a lo
w
level signal for 10 to 15 s
w
hen the po
w
er is off
See
Settings
Description
1 to 5
Setting the total n
u
mber of
u
nits 1 (factory defa
u
lt) to 5
See
Settings
Description
oFF
O
u
tp
u
t is off at po
w
er-on (factory defa
u
lt)
on
O
u
tp
u
t is on at po
w
er-on
See
Settings
Description
0
Master
u
nit or independent operation (factory defa
u
lt)
1
Slave
u
nit
Содержание PAT160-25T
Страница 17: ...General Description This chapter describes an overview and describes the features...
Страница 22: ...1 6 PAT T 4kW...
Страница 34: ...2 12 PAT T 4kW...
Страница 73: ...External Control This chapter describes external analog control and remote monitoring using the J1 connector...
Страница 106: ...6 12 PAT T 4kW...
Страница 158: ...7 52 PAT T 4KW...
Страница 159: ...Maintenance This chapter describes maintenance such as cleaning inspecting and calibrating...
Страница 171: ...Specifications This chapter describes the specifications and gives the dimensions of the PAT...