Chapter 5 Trial Operation and Tuning
ASDA-B2
5-2
Revision May, 2018
Inspection before
running the servo
drive
(has already applied
to the power)
The encoder cable should avoid excessive stress. When the
motor is running, make sure the cable is not frayed or over
extended.
Please contact with Delta if there is any vibration of the servo
motor or unusual noise during the operation.
Make sure the setting of the parameters is correct. Different
machinery has different characteristic, please adjust the
parameter according to the characteristic of each machinery.
Please reset the parameter when the servo drive is in SERVO
OFF status, or it may cause malfunction.
When the relay is operating, make sure it can work properly.
Check if the power indicator and LED display works normally.
PWM is used to control 7.5 kW. Thus, when the temperature is
lower than 40
℃
, the fan does not work.
Содержание ASD-B2-1521-F
Страница 1: ......
Страница 20: ...ASDA B2 Chapter 1 Installation and Model Explanation Revision May 2018 1 7 1 4 Servo Drive Features...
Страница 81: ...Chapter 3 Wiring ASDA B2 3 42 Revision May 2018 This page is intentionally left blank...
Страница 103: ...Chapter 5 Trial Operation and Tuning ASDA B2 5 12 Revision May 2018 5 5 2 Inertia Estimation Flowchart with Mechanism...
Страница 124: ...ASDA B2 Chapter 6 Control Modes of Operation Revision May 2018 6 13...