
Unpacking a 7HU shelf
98
Installation and Commissioning Manual
F
S
P
3000R
7 R
11
.1 8000
0015930
Issue
B
, ©
2012
ADVA AG Optical Netw
orking
ADVA Conf
idential
Procedure
To unpack a 7HU shelf perform the following steps:
Step 1
Move the shipping box with the 7HU shelf to the location where the
shelf will be installed.
Step 2
Open the shipping box only as follows:
a) Using a utility knife or scissors, cut open the band clamps strap-
ping the shipping box.
b) Lift the cap with the handles on the right and left side of the box so
that the box is opened.
Step 3
Lift the tray from the top of the shelf and set it aside. The tray consists
of items as shown in
Figure 1: Unpacking the 7HU shelf
Step 4
Take inventory.
A packing slip is located on the cap’s front side. Compare the con-
tents of the trays with the packing slip and the copy of the purchase
order list or equipment list provided by ADVA Optical Networking to
ensure complete and accurate shipment. Make a note of missing
items, if necessary.
P
S
Note
Make sure that the shipping box has been in the installation location
for a minimum period of 24 hours to avoid thermal shock and surface
condensation when unpacking.