
Chapter 6 Installing System Modules
Installation and Commissioning Manual
251
F
S
P
3000R
7 R
11
.1 8000
0015930
Issue
B
, ©
2012
ADVA AG Optical Netw
orking
ADVA Conf
idential
Step 11 Provision the CFP transceiver to be present in the NE data base as
described in the
Provisioning and Operations Manual
(if you install
the transceiver the fist time).
Step 12 Check the corresponding channel module port LED.
If this LED is off, the inserted CFP transceiver needs still to be
assigned using the management software (only when installed the
first time).
If this LED is yellow, it indicates that the port is equipped again and
the inserted transceiver module is already assigned, but there is no
traffic (only when replacing a transceiver).
If this LED is flashing red, the inserted CFP transceiver is the wrong
type, or it is not approved by ADVA Optical Networking, thus not
accepted by the system.
For more information about the channel module port LEDs, refer to
the
Maintenance and Troubleshooting Manual
.
If the CFP transceiver is not accepted by the system or does not
respond, remove it again from the cage. Install a new one of the cor-
rect type or reinsert the dust plug into the empty cage.
Step 13 If you have finished your work, mount the front cover to the shelf, as
“Mounting the SH7HU or SH9HU Front Cover” on p. 258
Step 14 Detach the wrist strap from your wrist, disconnect the grounding cable
from the ESD grounding point on the shelf (if available) or the rack,
and lay the earthing cable aside.
Step 15 Store the original shipping box of the CFP transceiver, including the
static-protective package and the resealable containers with the dust
plugs, dust covers, and the protective caps in a safe place for future
use.
Should you have any difficulty performing this procedure, contact ADVA Optical
Networking’s
.
End of Procedure
Repeat this procedure for each CFP transceiver to be installed.