This section contains the acronyms, abbreviations and symbols used through-
out this documentation. The terms and their spelled out forms or their meaning
are listed in alphabetical order.
This chapter describes the entire hardware installation process from a high-level
perspective.
Chapter 2: Prerequisites for Installation
This chapter includes safety guidelines, equipment precautions, tools and parts,
personnel requirements as well as other relevant prerequisites required to
assure a successful installation.
Chapter 3: Site Planning and Preparation
This chapter outlines the requirements and factors to be considered when plan-
ning and setting up the location for the FSP 3000R7.
Chapter 4: Unpacking and Inspecting
This chapter tells the process of unpacking and inspecting the product.
This chapter describes the procedures for mounting and earthing a shelf as well
as connecting the power.
Chapter 6: Installing System Modules
This chapter describes how to install system modules and how to mount and
remove the front cover of the shelves
Chapter 7: Interconnecting Shelves
This chapter describes how to connect the Shelf Control Units within a network
element.
This chapter describes how to power up/down the system and what have to be
considered.
Chapter 9: Connecting Optical Cables
This chapter describes how to establish internal and external optical connec-
tions as well as client side connections and network side connections.
Chapter 10: Commissioning the Shelves
This chapter describes how to do basic commissioning of the network element.