
Chapter 5 Installing Shelves
Installation and Commissioning Manual
175
F
S
P
3000R
7 R
11
.1 8000
0015930
Issue
B
, ©
2012
ADVA AG Optical Netw
orking
ADVA Conf
idential
Figure 32:
Assembling the Power Cord Locking Clamp to the AC Power
Supply
Step 5
Locate an AC power cord shipped with the equipment. Verify that the
power cord is assembled with a device plug of C13 type according to
IEC 60320 standard at the female end and with a country-specific,
three-conductor grounding type attachment plug at the male end.
Step 6
Insert the device plug into the appliance coupler on the faceplate of
the power supply unit (e.g. Power A). Secure the power cord with the
attached locking clamp (if available). See
for illustration.
Figure 33:
Example of Connecting the AC Power Cord to the PSU of the
SH7HU and SH1HU-R
Step 7
Pass the power cord through the space between two fiber fingers
(7HU shelf) and bend it about 90 degrees to the left or right in the fiber
tray (7HU shelf), depending on which side of the rack the power cable
is to be guided. See
above.
Inserting the squeezed clamp
into the guide
Assembled power cord
locking clamp
AC power cord
PSU/7HU-AC
SH7HU
SH1HU-R
PSU/1HU-R-AC
Power cord
locking clamp