
Installation and Commissioning Manual
321
F
S
P
3000R
7 R
11
.1 8000
0015930
Issue
B
, ©
2012
ADVA AG Optical Netw
orking
ADVA Conf
idential
Chapter 10
Commissioning the Shelves
This chapter describes the basic commissioning of the network element (NE).
Further configuration of traffic, fault, performance and security features should
be done after the whole installation procedure is finished. These tasks are
described in the
Provisioning and Operations Manual
.
The following sections are provided:
, which tells who this document is intended for.
, which tells about additional knowledge needed.
, which lists the documents required for a successful
basic commissioning of the FSP 3000R7 system.
, which lists software related information needed for com-
missioning.
, which lists the tools required for commissioning the FSP
3000R7 system.
which provides a brief overview of the commissioning
process.
, which describes how to set up the shelf ID.
Connecting to the Network Element
, which describes the different ways of con-
necting to the network element.
Using Terminal Emulation Programs
, which lists some useful programs tested
and in detail describes how to use HyperTerminal as well as PuTTY especially.
Logging On to the Network Element
, which describes how to log into the net-
work element.
, which describes how to provision cable connec-
tions.
, which describes how to set up date and time in depen-
dency of being connected to network time protocol (NTP) servers.
, which describes how to provision the NCU’s
serial port as well as its Ethernet port.