Introduction 1-13
Note:
This is an excerpt from an agency-controlled
document for illustration purposes only. Changes to the
base controlled document require agency approval. For a
full-size copy of this drawing, please contact ADS and
request drawing number
8000BK0009-CERT
.
Note:
The Telog Ru-33 and Ru-35 can be connected to
the
COMM + EXT PWR
port on the
monitor
using the Telog-Triton Comm Cable (ADS p/n 8000-0054-
01). However, this configuration has not been included on
this drawing because the Telog unit is not certified for IS
operation. Therefore, an installation involving this
configuration will not be considered intrinsically safe,
unless the Ru-33 or Ru-35 is installed outside the
hazardous area.
Cellular Modem Information and Compliance
Wireless telemetry is provided via a third-party, FCC- and carrier-
approved, commercial HSPA+/GSM, Verizon LTE-M, or
WorldWide LTE_M modem inside the
monitor and a
corresponding antenna. Two antenna options are available through
ADS. However, customers may obtain their own antennas to
accommodate specific needs or requirements. If a customer-
supplied antenna is preferable or required, consult an ADS
representative prior to installing the antenna to ensure it will
adequately support
monitor communications and
compliance.
European ATEX Hazardous Area Compliance
The following instructions apply to equipment covered by the
certificate numbered Sira 09ATEX2027X (
, USB Serial
Interface, Combo Sensors CSX Series, IS PSTN modem, and IS
modem DAA). Reference European ATEX Directive 2014/34/EU,
Annex II, 1.0.6:
Содержание 507165
Страница 20: ...1 12 ADS TRITON Manual Control Drawing ...
Страница 27: ...Introduction 1 19 CS6 LRD Sensor Certificate of Conformity ...
Страница 29: ...Introduction 1 21 CSA Certificate of Compliance Page 1 of 7 ...
Страница 30: ...1 22 ADS TRITON Manual CSA Certificate of Compliance Page 2 of 7 ...
Страница 31: ...Introduction 1 23 CSA Certificate of Compliance Page 3 of 7 ...
Страница 32: ...1 24 ADS TRITON Manual CSA Certificate of Compliance Page 4 of 7 ...
Страница 33: ...Introduction 1 25 CSA Certificate of Compliance Page 5 of 7 ...
Страница 34: ...1 26 ADS TRITON Manual CSA Certificate of Compliance Page 6 of 7 ...
Страница 35: ...Introduction 1 27 CSA Certificate of Compliance Page 7 of 7 ...
Страница 37: ...Introduction 1 29 Sample TRITON Declaration of Conformity Page 2 ...
Страница 53: ...System Overview 2 13 ExPAC XBUS ...
Страница 266: ...5 60 ADS TRITON Manual z Installing the Submersion Sensor z Measuring the physical offset ...
Страница 288: ...5 82 ADS TRITON Manual Topside Wall Mount Bracket Topside Sensor Bracket ...
Страница 292: ...5 86 ADS TRITON Manual Confirm Level Front to Back Installed ParaDepth ParaFlow Wall Mount Bracket ...
Страница 315: ...External Power 6 9 Power supply firmly secured to the DIN rail Front view of power supply mounted to DIN rail ...
Страница 327: ...External Power 6 21 Wires exiting DC output terminal on power supply POWER SUPPLY DC OUTPUT TERMINAL CONNECTIONS ...
Страница 345: ...7 2 ADS TRITON Manual use of this installation guide or the installation of any ADS equipment ...
Страница 358: ...Inclinometer 8 3 ...
Страница 507: ...C 4 ADS TRITON Manual ...
Страница 535: ...Index In 19 wiring to the monitor 6 29 XIO device parameters 4 84 ...