
Index In-11
3/4-band mount, 5-45
3/4-band mount with silt mount
adapter, 5-47, 5-50
silt mount adapter, 5-47, 5-50
IS certification, 1-5
overview, 2-28
peak velocity measurement, 2-
29
pressure depth measurement, 2-
28
upward ultrasonic depth
measurement, 2-28
pressure sensor dryer tube
replacing desiccant, 11-22
replacing pressure sensor dryer
tube, 11-21
securing dryer tube to the monitor,
5-99
silt mount adapter, 5-24, 5-47, 5-
50
special installation, 5-44
specifications, A-14
troubleshooting
peak velocity, 11-63
pressure depth, 11-68
temperature, 11-70
upward ultrasonic depth, 11-60
peak velocity
editing sensor device parameters,
4-56, 4-77
measurement, 2-27, 2-29, 2-33
troubleshooting, 11-63
physical offset, 4-50, 4-67, 4-69
Surface Combo Sensor, 5-35
Ultrasonic Depth Sensor, 5-35
ping amplitude, 4-30, 4-36, 4-53, 4-
60, 4-76, 4-80
pipe
conditions, 5-5
dimensions, 5-6
securing sensor cables, 5-95
shape, 5-6
pipe height, 4-27, 4-51, 4-67, 4-70
ports, 2-9
connecting a water quality sampler
to the monitor, 5-97
connecting sensors to the monitor,
5-97
power, 1-5
12-volt IS battery pack, 2-3, 2-11
battery pack, 1-5, 2-3
replacement, 11-12
checking battery pack voltage, 11-
9
consumption, 6-3
ExPAC, 1-5, 2-3, 2-12
external, 6-1
ExPAC, 6-18, 6-29
installation, 6-2
mounting the XBUS, 6-5
mounting the XIO, 6-5
power supply, 6-15, 6-18
requirements, 6-3
running the ground wires, 6-22,
6-29, 6-34
supplying to system, 6-36
XBUS, 6-29
XIO, 6-29
internal
12-volt IS battery pack, 2-11
checking battery pack voltage,
11-9
replacing the battery pack, 11-
12
regulator
replacement, 11-35
replacing fuses, 11-35
replacing the regulator, 11-35
running the ground wires, 6-22, 6-
29, 6-34
supply to system, 6-36
wiring the AC power cable to the
power supply, 6-15
wiring the monitor to the ExPAC,
6-29
wiring the monitor to the XBUS,
6-29
wiring the monitor to the XIO, 6-
29
Содержание 507165
Страница 20: ...1 12 ADS TRITON Manual Control Drawing ...
Страница 27: ...Introduction 1 19 CS6 LRD Sensor Certificate of Conformity ...
Страница 29: ...Introduction 1 21 CSA Certificate of Compliance Page 1 of 7 ...
Страница 30: ...1 22 ADS TRITON Manual CSA Certificate of Compliance Page 2 of 7 ...
Страница 31: ...Introduction 1 23 CSA Certificate of Compliance Page 3 of 7 ...
Страница 32: ...1 24 ADS TRITON Manual CSA Certificate of Compliance Page 4 of 7 ...
Страница 33: ...Introduction 1 25 CSA Certificate of Compliance Page 5 of 7 ...
Страница 34: ...1 26 ADS TRITON Manual CSA Certificate of Compliance Page 6 of 7 ...
Страница 35: ...Introduction 1 27 CSA Certificate of Compliance Page 7 of 7 ...
Страница 37: ...Introduction 1 29 Sample TRITON Declaration of Conformity Page 2 ...
Страница 53: ...System Overview 2 13 ExPAC XBUS ...
Страница 266: ...5 60 ADS TRITON Manual z Installing the Submersion Sensor z Measuring the physical offset ...
Страница 288: ...5 82 ADS TRITON Manual Topside Wall Mount Bracket Topside Sensor Bracket ...
Страница 292: ...5 86 ADS TRITON Manual Confirm Level Front to Back Installed ParaDepth ParaFlow Wall Mount Bracket ...
Страница 315: ...External Power 6 9 Power supply firmly secured to the DIN rail Front view of power supply mounted to DIN rail ...
Страница 327: ...External Power 6 21 Wires exiting DC output terminal on power supply POWER SUPPLY DC OUTPUT TERMINAL CONNECTIONS ...
Страница 345: ...7 2 ADS TRITON Manual use of this installation guide or the installation of any ADS equipment ...
Страница 358: ...Inclinometer 8 3 ...
Страница 507: ...C 4 ADS TRITON Manual ...
Страница 535: ...Index In 19 wiring to the monitor 6 29 XIO device parameters 4 84 ...