
3-20
ADS
Manual
facing the pressure valve. Slide the SIM card
all the way
into
the holder, and press down to lock it into place. The holder’s
spring mechanism should secure the card in the holder.
11.
Once SIM card is firmly seated, close up Regulator/Modem
Bowl tightening brass nut finger tight. Ensure no cables are
caught between bowl and monitor top.
12.
(
applicable only to battery-powered monitors
) Reconnect the
battery cable to the cable exiting from the hole in the top/dome
assembly.
13.
Coil the excess cabling around the inner wall of the canister
(
when applicable
), and carefully lower the top/dome assembly
back onto the canister. Keeping the proper orientation between
the canister and the top is critical to maintaining the watertight
and airtight seal on the monitor. Once the top has been torqued
down after manufacture, the sealing gasket develops a memory
profile of the canister lip. Reassembling the two pieces in the
same orientation as before helps the gasket mate correctly with
the canister lip.
Note:
Be careful to avoid pinching the battery cable
(
when applicable
) between the canister sealing lip and the
gasket on the monitor top during reassembly. The cable
also can get trapped between the two parts while
tightening the bolts on the monitor top, preventing an
effective air/watertight seal and potentially damaging the
battery cable and/or the gasket.
Connecting the Antenna to the Monitor
Note:
ADS recommends installing the antenna prior to
connecting the antenna to the monitor.
Connect the antenna to the monitor in the following way:
1.
Attach the antenna cable connector to the
ANTENNA
port on
the monitor top (first removing the electrical tape from the
cable end, when applicable).
Содержание 507165
Страница 20: ...1 12 ADS TRITON Manual Control Drawing ...
Страница 27: ...Introduction 1 19 CS6 LRD Sensor Certificate of Conformity ...
Страница 29: ...Introduction 1 21 CSA Certificate of Compliance Page 1 of 7 ...
Страница 30: ...1 22 ADS TRITON Manual CSA Certificate of Compliance Page 2 of 7 ...
Страница 31: ...Introduction 1 23 CSA Certificate of Compliance Page 3 of 7 ...
Страница 32: ...1 24 ADS TRITON Manual CSA Certificate of Compliance Page 4 of 7 ...
Страница 33: ...Introduction 1 25 CSA Certificate of Compliance Page 5 of 7 ...
Страница 34: ...1 26 ADS TRITON Manual CSA Certificate of Compliance Page 6 of 7 ...
Страница 35: ...Introduction 1 27 CSA Certificate of Compliance Page 7 of 7 ...
Страница 37: ...Introduction 1 29 Sample TRITON Declaration of Conformity Page 2 ...
Страница 53: ...System Overview 2 13 ExPAC XBUS ...
Страница 266: ...5 60 ADS TRITON Manual z Installing the Submersion Sensor z Measuring the physical offset ...
Страница 288: ...5 82 ADS TRITON Manual Topside Wall Mount Bracket Topside Sensor Bracket ...
Страница 292: ...5 86 ADS TRITON Manual Confirm Level Front to Back Installed ParaDepth ParaFlow Wall Mount Bracket ...
Страница 315: ...External Power 6 9 Power supply firmly secured to the DIN rail Front view of power supply mounted to DIN rail ...
Страница 327: ...External Power 6 21 Wires exiting DC output terminal on power supply POWER SUPPLY DC OUTPUT TERMINAL CONNECTIONS ...
Страница 345: ...7 2 ADS TRITON Manual use of this installation guide or the installation of any ADS equipment ...
Страница 358: ...Inclinometer 8 3 ...
Страница 507: ...C 4 ADS TRITON Manual ...
Страница 535: ...Index In 19 wiring to the monitor 6 29 XIO device parameters 4 84 ...