Specifications
A-5
reading is equal to one reading. Therefore, each total below
represents the actual entities plus one date/time stamp. A
date/time stamp must be included for each monitoring point
associated with the monitor.
Peak Combo
Sensor
AV|Gated
Sensor
Surface
Combo
Sensor
Ultrasonic
Depth Sensor
7
7
6
3
x
Deduct 2 to 3 days from the total days of storage to
compensate for additional overhead in memory.
Following is the equation for calculating the total days of storage
available in the monitor memory:
Data Storage Available in the Monitor (in Bytes)
=
Total Days of
Storage in the
Monitor
Memory
Number of
Readings
Taken per
Day for
One entity
X
Memory
Consumed for
One Entity
Reading
(Date/Time
Stamp)
X
Number of
Entities Logged
by the Monitor
(based on the
selected
devices)
For example, recording data at a 15-minute sample rate using a
Peak Combo Sensor offers approximately 150 days of data storage.
851,968 bytes
= 158 days (
150 when
accounting for
overhead
)
96 readings
X 8 bytes
X 7 entities (including
1 for the date/ time
stamp)
Содержание 507165
Страница 20: ...1 12 ADS TRITON Manual Control Drawing ...
Страница 27: ...Introduction 1 19 CS6 LRD Sensor Certificate of Conformity ...
Страница 29: ...Introduction 1 21 CSA Certificate of Compliance Page 1 of 7 ...
Страница 30: ...1 22 ADS TRITON Manual CSA Certificate of Compliance Page 2 of 7 ...
Страница 31: ...Introduction 1 23 CSA Certificate of Compliance Page 3 of 7 ...
Страница 32: ...1 24 ADS TRITON Manual CSA Certificate of Compliance Page 4 of 7 ...
Страница 33: ...Introduction 1 25 CSA Certificate of Compliance Page 5 of 7 ...
Страница 34: ...1 26 ADS TRITON Manual CSA Certificate of Compliance Page 6 of 7 ...
Страница 35: ...Introduction 1 27 CSA Certificate of Compliance Page 7 of 7 ...
Страница 37: ...Introduction 1 29 Sample TRITON Declaration of Conformity Page 2 ...
Страница 53: ...System Overview 2 13 ExPAC XBUS ...
Страница 266: ...5 60 ADS TRITON Manual z Installing the Submersion Sensor z Measuring the physical offset ...
Страница 288: ...5 82 ADS TRITON Manual Topside Wall Mount Bracket Topside Sensor Bracket ...
Страница 292: ...5 86 ADS TRITON Manual Confirm Level Front to Back Installed ParaDepth ParaFlow Wall Mount Bracket ...
Страница 315: ...External Power 6 9 Power supply firmly secured to the DIN rail Front view of power supply mounted to DIN rail ...
Страница 327: ...External Power 6 21 Wires exiting DC output terminal on power supply POWER SUPPLY DC OUTPUT TERMINAL CONNECTIONS ...
Страница 345: ...7 2 ADS TRITON Manual use of this installation guide or the installation of any ADS equipment ...
Страница 358: ...Inclinometer 8 3 ...
Страница 507: ...C 4 ADS TRITON Manual ...
Страница 535: ...Index In 19 wiring to the monitor 6 29 XIO device parameters 4 84 ...