
3-18
ADS
Manual
2.
Brush off the monitor enclosure and remove the 4 bolts
securing the top to the canister using a 13-mm nut driver.
Note:
Make a note of the orientation of the monitor top to
the canister before removing the bolts. Keeping proper
orientation between the canister and the top is critical to
maintaining the water and airtight seal on the monitor.
3.
Wipe away any debris or moisture that could enter the chassis
once the unit is opened.
4.
Remove the top (with the attached power regulator dome) by
pulling it straight up from the canister. The battery rests at the
bottom of the canister, and an 18-inch long cable extends from
the battery pack to the top.
Placing the top next to the monitor (left) and disconnecting the cables at the
plastic white connectors (right)
5.
Place the top next to the canister, and then disconnect the
battery cable from the dome cable and set the top/power
regulator dome assembly aside.
Note:
Keep the underside of the top, the regulator dome,
and the top gasket free of dirt, mud, and other debris.
Debris and dirt can compromise the seal of the monitor
once it is reassembled. In addition, inspect the monitor
seal for damage.
Содержание 507165
Страница 20: ...1 12 ADS TRITON Manual Control Drawing ...
Страница 27: ...Introduction 1 19 CS6 LRD Sensor Certificate of Conformity ...
Страница 29: ...Introduction 1 21 CSA Certificate of Compliance Page 1 of 7 ...
Страница 30: ...1 22 ADS TRITON Manual CSA Certificate of Compliance Page 2 of 7 ...
Страница 31: ...Introduction 1 23 CSA Certificate of Compliance Page 3 of 7 ...
Страница 32: ...1 24 ADS TRITON Manual CSA Certificate of Compliance Page 4 of 7 ...
Страница 33: ...Introduction 1 25 CSA Certificate of Compliance Page 5 of 7 ...
Страница 34: ...1 26 ADS TRITON Manual CSA Certificate of Compliance Page 6 of 7 ...
Страница 35: ...Introduction 1 27 CSA Certificate of Compliance Page 7 of 7 ...
Страница 37: ...Introduction 1 29 Sample TRITON Declaration of Conformity Page 2 ...
Страница 53: ...System Overview 2 13 ExPAC XBUS ...
Страница 266: ...5 60 ADS TRITON Manual z Installing the Submersion Sensor z Measuring the physical offset ...
Страница 288: ...5 82 ADS TRITON Manual Topside Wall Mount Bracket Topside Sensor Bracket ...
Страница 292: ...5 86 ADS TRITON Manual Confirm Level Front to Back Installed ParaDepth ParaFlow Wall Mount Bracket ...
Страница 315: ...External Power 6 9 Power supply firmly secured to the DIN rail Front view of power supply mounted to DIN rail ...
Страница 327: ...External Power 6 21 Wires exiting DC output terminal on power supply POWER SUPPLY DC OUTPUT TERMINAL CONNECTIONS ...
Страница 345: ...7 2 ADS TRITON Manual use of this installation guide or the installation of any ADS equipment ...
Страница 358: ...Inclinometer 8 3 ...
Страница 507: ...C 4 ADS TRITON Manual ...
Страница 535: ...Index In 19 wiring to the monitor 6 29 XIO device parameters 4 84 ...