
Sensor Installation and Connection 5-25
Mounting the AV|Gated, AV|Max or Peak Combo sensors to the ring
If the sensors require the use of a
Silt Mount Adapter
(ADS p/n
8000-0271) to install the sensor further up the left side of the
pipe (up to 30 degrees) attach the AV|Gated, AV|Max or Peak
Combo sensor to the ring in the following way:
Seat the sensor onto the slightly elevated portion of the top
of the Silt Mount Adapter. The elevated portion of the
adapter should insert easily into the inset portion of the
bottom of the sensor. Orient the sensor so that the sensor
cable is exiting the sharp, or
wedged
, side of the adapter.
From the bottom of the adapter, use two M3 X 10mm
stainless steel flathead screws (
do not substitute any other
screws
) to secure the sensor to the adapter. The pre-drilled
screw holes in the adapter and in the bottom of the sensor
should be in alignment if the sensor is seated properly on
the adapter.
Содержание 507165
Страница 20: ...1 12 ADS TRITON Manual Control Drawing ...
Страница 27: ...Introduction 1 19 CS6 LRD Sensor Certificate of Conformity ...
Страница 29: ...Introduction 1 21 CSA Certificate of Compliance Page 1 of 7 ...
Страница 30: ...1 22 ADS TRITON Manual CSA Certificate of Compliance Page 2 of 7 ...
Страница 31: ...Introduction 1 23 CSA Certificate of Compliance Page 3 of 7 ...
Страница 32: ...1 24 ADS TRITON Manual CSA Certificate of Compliance Page 4 of 7 ...
Страница 33: ...Introduction 1 25 CSA Certificate of Compliance Page 5 of 7 ...
Страница 34: ...1 26 ADS TRITON Manual CSA Certificate of Compliance Page 6 of 7 ...
Страница 35: ...Introduction 1 27 CSA Certificate of Compliance Page 7 of 7 ...
Страница 37: ...Introduction 1 29 Sample TRITON Declaration of Conformity Page 2 ...
Страница 53: ...System Overview 2 13 ExPAC XBUS ...
Страница 266: ...5 60 ADS TRITON Manual z Installing the Submersion Sensor z Measuring the physical offset ...
Страница 288: ...5 82 ADS TRITON Manual Topside Wall Mount Bracket Topside Sensor Bracket ...
Страница 292: ...5 86 ADS TRITON Manual Confirm Level Front to Back Installed ParaDepth ParaFlow Wall Mount Bracket ...
Страница 315: ...External Power 6 9 Power supply firmly secured to the DIN rail Front view of power supply mounted to DIN rail ...
Страница 327: ...External Power 6 21 Wires exiting DC output terminal on power supply POWER SUPPLY DC OUTPUT TERMINAL CONNECTIONS ...
Страница 345: ...7 2 ADS TRITON Manual use of this installation guide or the installation of any ADS equipment ...
Страница 358: ...Inclinometer 8 3 ...
Страница 507: ...C 4 ADS TRITON Manual ...
Страница 535: ...Index In 19 wiring to the monitor 6 29 XIO device parameters 4 84 ...