Configuration and Activation 4-99
16.
Repeat steps 2 through 12 for each additional device that
includes a sensor(s) you want to confirm.
Note:
If the location supports a second monitoring point,
remember to confirm the devices assigned to that
monitoring point, as necessary.
17.
If a change has been made to any sensor parameter, reactivate
the monitor. See page 4-88 for more information on
reactivating a monitor.
If
you didn’t change any
device
parameters, there is no need to reactivate the monitor.
18.
Click on the green
Hangup
button in the
Functions
section to
disconnect from the monitor.
Q
start
XML
generates a log entry of the confirmation activity,
which includes the field and monitor readings, the name of the
crew, and any associated comments, and saves it to the local
directory or network. It also generates a log entry for each
user-initiated reading taken by the monitor that includes the
sensor fired, date and time at which the measurement was
taken, current device parameters corresponding to the sensor,
and reading and associated quality. These entries are
available for viewing through the log viewer in
Q
start
XML
.
Содержание 507165
Страница 20: ...1 12 ADS TRITON Manual Control Drawing ...
Страница 27: ...Introduction 1 19 CS6 LRD Sensor Certificate of Conformity ...
Страница 29: ...Introduction 1 21 CSA Certificate of Compliance Page 1 of 7 ...
Страница 30: ...1 22 ADS TRITON Manual CSA Certificate of Compliance Page 2 of 7 ...
Страница 31: ...Introduction 1 23 CSA Certificate of Compliance Page 3 of 7 ...
Страница 32: ...1 24 ADS TRITON Manual CSA Certificate of Compliance Page 4 of 7 ...
Страница 33: ...Introduction 1 25 CSA Certificate of Compliance Page 5 of 7 ...
Страница 34: ...1 26 ADS TRITON Manual CSA Certificate of Compliance Page 6 of 7 ...
Страница 35: ...Introduction 1 27 CSA Certificate of Compliance Page 7 of 7 ...
Страница 37: ...Introduction 1 29 Sample TRITON Declaration of Conformity Page 2 ...
Страница 53: ...System Overview 2 13 ExPAC XBUS ...
Страница 266: ...5 60 ADS TRITON Manual z Installing the Submersion Sensor z Measuring the physical offset ...
Страница 288: ...5 82 ADS TRITON Manual Topside Wall Mount Bracket Topside Sensor Bracket ...
Страница 292: ...5 86 ADS TRITON Manual Confirm Level Front to Back Installed ParaDepth ParaFlow Wall Mount Bracket ...
Страница 315: ...External Power 6 9 Power supply firmly secured to the DIN rail Front view of power supply mounted to DIN rail ...
Страница 327: ...External Power 6 21 Wires exiting DC output terminal on power supply POWER SUPPLY DC OUTPUT TERMINAL CONNECTIONS ...
Страница 345: ...7 2 ADS TRITON Manual use of this installation guide or the installation of any ADS equipment ...
Страница 358: ...Inclinometer 8 3 ...
Страница 507: ...C 4 ADS TRITON Manual ...
Страница 535: ...Index In 19 wiring to the monitor 6 29 XIO device parameters 4 84 ...