
Configuration and Activation 4-97
1.
Select the monitor for which you want to perform
confirmations from the
Location Name
field in the
Monitor
section on the
ADS Q
start
XML
dialog.
2.
Select the device with the sensor(s) you want to confirm from
the
Devices
list.
3.
Click on the
Confirm
button on the
Monitoring Point
tab.
Q
start
XML
establishes a connection with the monitor and
displays the
Confirm Device
dialog.
4.
Select the point of reference from which to compare manual
depth to the actual sensor readings from the drop-down list in
the
Field Measurement
section.
DOF
Represents the depth of the flow from the bottom of
the pipe to the flow surface.
Air DOF Crown
Represents the distance (or
range
) from
the top (or
crown
) of the pipe to the flow surface.
Air DOF Bat
Represents the distance (or
range
) from the
ultrasonic depth sensor face (crystal surface) to the flow
surface.
5.
Enter the distance measured manually from the bottom of the
pipe to the flow surface in the
Depth
field
or
the range from
the pipe crown/sensor face (as applicable) to the flow surface
in the
Range
field. The measurement perspective depends on
the option selected in step 4. Enter any estimated deviation
corresponding to the measurement in the
+/-
field.
6.
Enter the velocity of the flow measured manually using a
portable velocity meter in the
Velocity
field.
7.
Enter the initials or designation for the field personnel in the
Crew
field.
8.
As applicable, enter the Velocity Profile information. The
average velocity will be automatically calculated by
Q
start
XML
.
9.
Enter any information corresponding to the field
measurements, the flow conditions, or location that may be
relevant to the confirmations in the
Comments
field.
Содержание 507165
Страница 20: ...1 12 ADS TRITON Manual Control Drawing ...
Страница 27: ...Introduction 1 19 CS6 LRD Sensor Certificate of Conformity ...
Страница 29: ...Introduction 1 21 CSA Certificate of Compliance Page 1 of 7 ...
Страница 30: ...1 22 ADS TRITON Manual CSA Certificate of Compliance Page 2 of 7 ...
Страница 31: ...Introduction 1 23 CSA Certificate of Compliance Page 3 of 7 ...
Страница 32: ...1 24 ADS TRITON Manual CSA Certificate of Compliance Page 4 of 7 ...
Страница 33: ...Introduction 1 25 CSA Certificate of Compliance Page 5 of 7 ...
Страница 34: ...1 26 ADS TRITON Manual CSA Certificate of Compliance Page 6 of 7 ...
Страница 35: ...Introduction 1 27 CSA Certificate of Compliance Page 7 of 7 ...
Страница 37: ...Introduction 1 29 Sample TRITON Declaration of Conformity Page 2 ...
Страница 53: ...System Overview 2 13 ExPAC XBUS ...
Страница 266: ...5 60 ADS TRITON Manual z Installing the Submersion Sensor z Measuring the physical offset ...
Страница 288: ...5 82 ADS TRITON Manual Topside Wall Mount Bracket Topside Sensor Bracket ...
Страница 292: ...5 86 ADS TRITON Manual Confirm Level Front to Back Installed ParaDepth ParaFlow Wall Mount Bracket ...
Страница 315: ...External Power 6 9 Power supply firmly secured to the DIN rail Front view of power supply mounted to DIN rail ...
Страница 327: ...External Power 6 21 Wires exiting DC output terminal on power supply POWER SUPPLY DC OUTPUT TERMINAL CONNECTIONS ...
Страница 345: ...7 2 ADS TRITON Manual use of this installation guide or the installation of any ADS equipment ...
Страница 358: ...Inclinometer 8 3 ...
Страница 507: ...C 4 ADS TRITON Manual ...
Страница 535: ...Index In 19 wiring to the monitor 6 29 XIO device parameters 4 84 ...