
1-10 ADS
Manual
Warnings, Certifications, Cellular
Modem Compliance, and Conformity
Manhole and sewer system work involves confined space entry and
is inherently dangerous. Therefore, installers and technicians
should comply with all federal, state, and municipal regulations
concerning confined space entry.
In addition, personnel installing and maintaining this equipment
should follow all guidelines presented in this manual concerning
monitor installation and maintenance. Failure to strictly adhere to
these guidelines can result in personal injury and/or damage to the
monitor.
Changes or Modifications
Changes or modifications to the
flow monitor not
expressly approved by the party responsible for compliance will
void the IS certification.
Personnel performing installation of the
flow monitor
should carefully follow the guidelines contained in this manual
when installing and maintaining the monitor. Failure to strictly
adhere to these guidelines can result in personal injury and can
cause damage to the monitor, which would invalidate its warranty.
The
flow monitor is designed to be installed in
combined and sanitary sewer lines and manholes. This installation
work is inherently dangerous. All applicable safety guidelines
should be followed and carried out by at least two fully trained and
qualified persons.
Содержание 507165
Страница 20: ...1 12 ADS TRITON Manual Control Drawing ...
Страница 27: ...Introduction 1 19 CS6 LRD Sensor Certificate of Conformity ...
Страница 29: ...Introduction 1 21 CSA Certificate of Compliance Page 1 of 7 ...
Страница 30: ...1 22 ADS TRITON Manual CSA Certificate of Compliance Page 2 of 7 ...
Страница 31: ...Introduction 1 23 CSA Certificate of Compliance Page 3 of 7 ...
Страница 32: ...1 24 ADS TRITON Manual CSA Certificate of Compliance Page 4 of 7 ...
Страница 33: ...Introduction 1 25 CSA Certificate of Compliance Page 5 of 7 ...
Страница 34: ...1 26 ADS TRITON Manual CSA Certificate of Compliance Page 6 of 7 ...
Страница 35: ...Introduction 1 27 CSA Certificate of Compliance Page 7 of 7 ...
Страница 37: ...Introduction 1 29 Sample TRITON Declaration of Conformity Page 2 ...
Страница 53: ...System Overview 2 13 ExPAC XBUS ...
Страница 266: ...5 60 ADS TRITON Manual z Installing the Submersion Sensor z Measuring the physical offset ...
Страница 288: ...5 82 ADS TRITON Manual Topside Wall Mount Bracket Topside Sensor Bracket ...
Страница 292: ...5 86 ADS TRITON Manual Confirm Level Front to Back Installed ParaDepth ParaFlow Wall Mount Bracket ...
Страница 315: ...External Power 6 9 Power supply firmly secured to the DIN rail Front view of power supply mounted to DIN rail ...
Страница 327: ...External Power 6 21 Wires exiting DC output terminal on power supply POWER SUPPLY DC OUTPUT TERMINAL CONNECTIONS ...
Страница 345: ...7 2 ADS TRITON Manual use of this installation guide or the installation of any ADS equipment ...
Страница 358: ...Inclinometer 8 3 ...
Страница 507: ...C 4 ADS TRITON Manual ...
Страница 535: ...Index In 19 wiring to the monitor 6 29 XIO device parameters 4 84 ...