
11-22 ADS
Manual
Inserting the brass barbed fitting into the tube
5.
Secure the new dryer tube to the monitor.
6.
Remove the black end-cap from the dryer tube before re-
installing the monitor in the manhole.
Caution:
If the cap is not removed, air will not be able to
enter the dryer tube, adversely affecting the pressure depth
sensor.
7.
Use the
View
or
Read All
function in the
Q
start
XML
software
to fire the sensor and verify that the sensor is working
correctly.
Replacing the Desiccant
When replacing the desiccant inside the pressure depth sensor dryer
tube, use indicating beads that are approximately 0.16 inches (4.1
mm) in diameter. Smaller beads may be able to escape the dryer
tube, entering the clear plastic tubing leading to the sensor
connector. The desiccant beads of the appropriate size for this
dryer tube are available through ADS (p/n 901-11055-00).
Replace the desiccant in the following way:
1.
Clip the cable ties securing the dryer tube to the monitor, when
applicable.
2.
Use a 5/8-inch nut driver to remove the inset nut at the free end
of the dryer tube (end of the tube opposite the brass barbed
fitting).
Do not use pliers to remove this nut from the tube!
Содержание 507165
Страница 20: ...1 12 ADS TRITON Manual Control Drawing ...
Страница 27: ...Introduction 1 19 CS6 LRD Sensor Certificate of Conformity ...
Страница 29: ...Introduction 1 21 CSA Certificate of Compliance Page 1 of 7 ...
Страница 30: ...1 22 ADS TRITON Manual CSA Certificate of Compliance Page 2 of 7 ...
Страница 31: ...Introduction 1 23 CSA Certificate of Compliance Page 3 of 7 ...
Страница 32: ...1 24 ADS TRITON Manual CSA Certificate of Compliance Page 4 of 7 ...
Страница 33: ...Introduction 1 25 CSA Certificate of Compliance Page 5 of 7 ...
Страница 34: ...1 26 ADS TRITON Manual CSA Certificate of Compliance Page 6 of 7 ...
Страница 35: ...Introduction 1 27 CSA Certificate of Compliance Page 7 of 7 ...
Страница 37: ...Introduction 1 29 Sample TRITON Declaration of Conformity Page 2 ...
Страница 53: ...System Overview 2 13 ExPAC XBUS ...
Страница 266: ...5 60 ADS TRITON Manual z Installing the Submersion Sensor z Measuring the physical offset ...
Страница 288: ...5 82 ADS TRITON Manual Topside Wall Mount Bracket Topside Sensor Bracket ...
Страница 292: ...5 86 ADS TRITON Manual Confirm Level Front to Back Installed ParaDepth ParaFlow Wall Mount Bracket ...
Страница 315: ...External Power 6 9 Power supply firmly secured to the DIN rail Front view of power supply mounted to DIN rail ...
Страница 327: ...External Power 6 21 Wires exiting DC output terminal on power supply POWER SUPPLY DC OUTPUT TERMINAL CONNECTIONS ...
Страница 345: ...7 2 ADS TRITON Manual use of this installation guide or the installation of any ADS equipment ...
Страница 358: ...Inclinometer 8 3 ...
Страница 507: ...C 4 ADS TRITON Manual ...
Страница 535: ...Index In 19 wiring to the monitor 6 29 XIO device parameters 4 84 ...