
Sensor Installation and Connection 5-41
Quantity
Description
ADS P/N
point)
cable)
2
Up to 2
(1 per
monitoring
point)
Surface Combo Sensor
–
downward ultrasonic
depth sensor, surcharge pressure depth
sensor, surface velocity sensor, surcharge
velocity sensor and air temperature sensor
8K-CS5-V2-xx-
30/1H (30-ft./9.1-m
or 100-ft./30.5-m
cable)
2
Up to 2
(1 per
monitoring
point)
Ultrasonic depth sensor and air temperature
sensor
8K-CS5-D1-00-30
(30-ft./9.1-m cable)
1 as
needed
IS Standard or Custom Sensor Extension
Cable for Ultrasonic Depth Sensor
8000-0023
–
xxx
3
1 as
needed
IS Standard or Custom Sensor Extension
Cable for Peak Combo and Surface Combo
Sensors
8000-0025
–
xxx
3
1 as
needed
Bracket, mounting, sliding, for ParaDepth,
ParaFlow, Surface Combo or Ultrasonic Depth
Sensors (mounting plate)
8000-0307-02
1 as
needed
Adapter, silt mount for Peak Combo Sensor
8000-0271
1 as
needed
Special Surface Combo Sensor/Ultrasonic
Depth Sensor install band, SS, 12 in. long (Use
with corresponding mounting plate 8000-0307-
02)
700-100238-00
As needed
by length
Stainless steel mounting band
Contact ADS
1 as
needed
Sensor surcharge bracket (used only to mount
Ultrasonic Depth Sensor in manhole)
I40-0010
as needed
¼. In.
u
2 ¼ in. (M6 x 55mm) stainless steel
anchor bolts w/ nuts and washers
1
Replacement dryer tube
3704
–
0032
1
IS PC Communication USB Serial Cable
8000-0337
1
Antenna for wireless communication
3800-0162 or
3800-0163
1 as
needed
Magnet (
for activating diagnostic codes in the
monitor through the LED
STATUS
window
)
8000-0460
1 as
needed
External Power and Communications Unit
(ExPAC)
8000-0377
1 as
needed
24V DC power supply
508293
Содержание 507165
Страница 20: ...1 12 ADS TRITON Manual Control Drawing ...
Страница 27: ...Introduction 1 19 CS6 LRD Sensor Certificate of Conformity ...
Страница 29: ...Introduction 1 21 CSA Certificate of Compliance Page 1 of 7 ...
Страница 30: ...1 22 ADS TRITON Manual CSA Certificate of Compliance Page 2 of 7 ...
Страница 31: ...Introduction 1 23 CSA Certificate of Compliance Page 3 of 7 ...
Страница 32: ...1 24 ADS TRITON Manual CSA Certificate of Compliance Page 4 of 7 ...
Страница 33: ...Introduction 1 25 CSA Certificate of Compliance Page 5 of 7 ...
Страница 34: ...1 26 ADS TRITON Manual CSA Certificate of Compliance Page 6 of 7 ...
Страница 35: ...Introduction 1 27 CSA Certificate of Compliance Page 7 of 7 ...
Страница 37: ...Introduction 1 29 Sample TRITON Declaration of Conformity Page 2 ...
Страница 53: ...System Overview 2 13 ExPAC XBUS ...
Страница 266: ...5 60 ADS TRITON Manual z Installing the Submersion Sensor z Measuring the physical offset ...
Страница 288: ...5 82 ADS TRITON Manual Topside Wall Mount Bracket Topside Sensor Bracket ...
Страница 292: ...5 86 ADS TRITON Manual Confirm Level Front to Back Installed ParaDepth ParaFlow Wall Mount Bracket ...
Страница 315: ...External Power 6 9 Power supply firmly secured to the DIN rail Front view of power supply mounted to DIN rail ...
Страница 327: ...External Power 6 21 Wires exiting DC output terminal on power supply POWER SUPPLY DC OUTPUT TERMINAL CONNECTIONS ...
Страница 345: ...7 2 ADS TRITON Manual use of this installation guide or the installation of any ADS equipment ...
Страница 358: ...Inclinometer 8 3 ...
Страница 507: ...C 4 ADS TRITON Manual ...
Страница 535: ...Index In 19 wiring to the monitor 6 29 XIO device parameters 4 84 ...