
System Overview
2-37
Project Organization Checklist
In order to set up the
monitor to successfully communicate
and record flow information, the following steps must be performed.
Refer to the chapters identified for more detailed information.
Perform these steps prior to the field installation:
x
Activate the SIM card and get the IP address (
8000-
FST-IM-4WW-ATT, FST-IM-EP-4WW-ATT, 8000-FST-IM-
4WW-VZW, 8000-FST-IM-EP-4WW-VZW)
(Refer to Chapter3,
Activating the SIM Card)
Note:
Request the SIM activation
within 48 hours
of
monitor installation and
before
heading to the field to
install the
.
x
Configure and activate the monitor (in-office)
(Refer to Chapter 4,
Configuring the Monitor Location
and
Activating the Monitor)
Perform these steps in the field once the above steps are complete:
x
Install the Sensors
(Refer to Chapter 5, Sensor Installation and
Connection)
x
Install and connect the wireless antenna
(Refer to Chapter 3,
Installing the Wireless Antenna)
x
Install the monitor
(Refer to Chapter 7, Monitor Installation)
x
Connect to the monitor for on-site communication
(Refer to
Chapter 4, Activating the Monitor)
Содержание 507165
Страница 20: ...1 12 ADS TRITON Manual Control Drawing ...
Страница 27: ...Introduction 1 19 CS6 LRD Sensor Certificate of Conformity ...
Страница 29: ...Introduction 1 21 CSA Certificate of Compliance Page 1 of 7 ...
Страница 30: ...1 22 ADS TRITON Manual CSA Certificate of Compliance Page 2 of 7 ...
Страница 31: ...Introduction 1 23 CSA Certificate of Compliance Page 3 of 7 ...
Страница 32: ...1 24 ADS TRITON Manual CSA Certificate of Compliance Page 4 of 7 ...
Страница 33: ...Introduction 1 25 CSA Certificate of Compliance Page 5 of 7 ...
Страница 34: ...1 26 ADS TRITON Manual CSA Certificate of Compliance Page 6 of 7 ...
Страница 35: ...Introduction 1 27 CSA Certificate of Compliance Page 7 of 7 ...
Страница 37: ...Introduction 1 29 Sample TRITON Declaration of Conformity Page 2 ...
Страница 53: ...System Overview 2 13 ExPAC XBUS ...
Страница 266: ...5 60 ADS TRITON Manual z Installing the Submersion Sensor z Measuring the physical offset ...
Страница 288: ...5 82 ADS TRITON Manual Topside Wall Mount Bracket Topside Sensor Bracket ...
Страница 292: ...5 86 ADS TRITON Manual Confirm Level Front to Back Installed ParaDepth ParaFlow Wall Mount Bracket ...
Страница 315: ...External Power 6 9 Power supply firmly secured to the DIN rail Front view of power supply mounted to DIN rail ...
Страница 327: ...External Power 6 21 Wires exiting DC output terminal on power supply POWER SUPPLY DC OUTPUT TERMINAL CONNECTIONS ...
Страница 345: ...7 2 ADS TRITON Manual use of this installation guide or the installation of any ADS equipment ...
Страница 358: ...Inclinometer 8 3 ...
Страница 507: ...C 4 ADS TRITON Manual ...
Страница 535: ...Index In 19 wiring to the monitor 6 29 XIO device parameters 4 84 ...