
1-6 ADS
Manual
ADS’ 9000
-0080 antenna is the recommended antenna for use with
the
monitor. Customers also may obtain their own
antennas to accommodate specific project needs or requirements.
However, when assessing a third-party antenna, please consult an
ADS representative prior to installing the antenna to verify the
antenna can adequately support monitor communications.
Connecting the
to the Telog RTU (Model Ru-33) also
supports wireless communication via the Telog “passthrough”
mode. The Telog is mounted next to the
in the
hazardous area and connected to the monitor using the Triton-Telog
Comm Cable (ADS p/n 8000-0054-01).
However, please note that,
because the Telog unit does not possess IS certification, the
installation will not be considered intrinsically safe if the Telog unit
is installed in the manhole with the monitor.
Installation and IS Considerations
When installing the
flow monitor, carefully follow any
local regulations for the installation of IS equipment. For example,
many clients only allow the use of special
hazardous area
tools
(flashlights, radios, etc.) in manholes. Some clients will not allow
the use of an electric drill, either battery-powered or AC-powered,
in a manhole. In this case, air (i.e., pneumatic) tools must be used.
When in doubt as to the applicable regulations, check with the
client or the client’s designated safety r
epresentative.
Specific Conditions of Use
During the ATEX/IECEx/CSA/UKCA approval process, certain
conditions are set forth that must be observed when using the
certified equipment. These
Specific Conditions of Use
can be found
in the body of each certification (referenced in this manual), as well
as on a page attached to the Declaration of Conformity. Following
is a summary of these Safe Use Instructions:
Содержание 507165
Страница 20: ...1 12 ADS TRITON Manual Control Drawing ...
Страница 27: ...Introduction 1 19 CS6 LRD Sensor Certificate of Conformity ...
Страница 29: ...Introduction 1 21 CSA Certificate of Compliance Page 1 of 7 ...
Страница 30: ...1 22 ADS TRITON Manual CSA Certificate of Compliance Page 2 of 7 ...
Страница 31: ...Introduction 1 23 CSA Certificate of Compliance Page 3 of 7 ...
Страница 32: ...1 24 ADS TRITON Manual CSA Certificate of Compliance Page 4 of 7 ...
Страница 33: ...Introduction 1 25 CSA Certificate of Compliance Page 5 of 7 ...
Страница 34: ...1 26 ADS TRITON Manual CSA Certificate of Compliance Page 6 of 7 ...
Страница 35: ...Introduction 1 27 CSA Certificate of Compliance Page 7 of 7 ...
Страница 37: ...Introduction 1 29 Sample TRITON Declaration of Conformity Page 2 ...
Страница 53: ...System Overview 2 13 ExPAC XBUS ...
Страница 266: ...5 60 ADS TRITON Manual z Installing the Submersion Sensor z Measuring the physical offset ...
Страница 288: ...5 82 ADS TRITON Manual Topside Wall Mount Bracket Topside Sensor Bracket ...
Страница 292: ...5 86 ADS TRITON Manual Confirm Level Front to Back Installed ParaDepth ParaFlow Wall Mount Bracket ...
Страница 315: ...External Power 6 9 Power supply firmly secured to the DIN rail Front view of power supply mounted to DIN rail ...
Страница 327: ...External Power 6 21 Wires exiting DC output terminal on power supply POWER SUPPLY DC OUTPUT TERMINAL CONNECTIONS ...
Страница 345: ...7 2 ADS TRITON Manual use of this installation guide or the installation of any ADS equipment ...
Страница 358: ...Inclinometer 8 3 ...
Страница 507: ...C 4 ADS TRITON Manual ...
Страница 535: ...Index In 19 wiring to the monitor 6 29 XIO device parameters 4 84 ...