
Sensor Installation and Connection 5-7
Installing the Sensors in the Pipe
This section includes the procedures for performing sensor
installations using one of the following methods:
z
Standard Installations
z
Special Installations
Note:
When installing a monitor with wireless
communications, it is very important to test the
with the SIM card installed to ensure the
entire system
functions and to verify network quality of service before
installation. This check should be done
before
field
deployment and again at the monitoring site before
installing the monitor. Refer to
Chapter 3
,
Communication
,
for more information.
Standard Installation
Performing a standard sensor installation involves the following
process:
z
Gathering the parts and supplies
z
Gathering the tools and equipment
z
Assembling the ring
z
Mounting the sensors on the ring
z
Securing the cables to the ring
z
Installing the ring in the pipe
Содержание 507165
Страница 20: ...1 12 ADS TRITON Manual Control Drawing ...
Страница 27: ...Introduction 1 19 CS6 LRD Sensor Certificate of Conformity ...
Страница 29: ...Introduction 1 21 CSA Certificate of Compliance Page 1 of 7 ...
Страница 30: ...1 22 ADS TRITON Manual CSA Certificate of Compliance Page 2 of 7 ...
Страница 31: ...Introduction 1 23 CSA Certificate of Compliance Page 3 of 7 ...
Страница 32: ...1 24 ADS TRITON Manual CSA Certificate of Compliance Page 4 of 7 ...
Страница 33: ...Introduction 1 25 CSA Certificate of Compliance Page 5 of 7 ...
Страница 34: ...1 26 ADS TRITON Manual CSA Certificate of Compliance Page 6 of 7 ...
Страница 35: ...Introduction 1 27 CSA Certificate of Compliance Page 7 of 7 ...
Страница 37: ...Introduction 1 29 Sample TRITON Declaration of Conformity Page 2 ...
Страница 53: ...System Overview 2 13 ExPAC XBUS ...
Страница 266: ...5 60 ADS TRITON Manual z Installing the Submersion Sensor z Measuring the physical offset ...
Страница 288: ...5 82 ADS TRITON Manual Topside Wall Mount Bracket Topside Sensor Bracket ...
Страница 292: ...5 86 ADS TRITON Manual Confirm Level Front to Back Installed ParaDepth ParaFlow Wall Mount Bracket ...
Страница 315: ...External Power 6 9 Power supply firmly secured to the DIN rail Front view of power supply mounted to DIN rail ...
Страница 327: ...External Power 6 21 Wires exiting DC output terminal on power supply POWER SUPPLY DC OUTPUT TERMINAL CONNECTIONS ...
Страница 345: ...7 2 ADS TRITON Manual use of this installation guide or the installation of any ADS equipment ...
Страница 358: ...Inclinometer 8 3 ...
Страница 507: ...C 4 ADS TRITON Manual ...
Страница 535: ...Index In 19 wiring to the monitor 6 29 XIO device parameters 4 84 ...