
Configuration and Activation 4-9
dialog based on the
Default Location
(designated on the
Settings
dialog), without changing the location name.
3.
Select
as the type of monitor the location from the
Series
drop-down list. If you selected an existing site from the
Location Name
drop-down list, this field will automatically
display the monitor series corresponding to that location.
4.
Enter or edit the monitor serial number in the
Serial Number
field.
5.
Verify or select the interval at which you want the monitor to
take measurements and log data from the
Sample Rate
drop-
down list.
6.
Verify or select the interval at which you want the monitor to
take measurements and log data when a threshold has been
crossed from the
Fast Rate
drop-down list.
7.
Verify or select the interval at which you want the monitor to
scan the sensors to detect whether a threshold has been crossed
in the
Scan Rate
drop-down list.
8.
Enter or edit the distance (in inches or mm) from the manhole
rim to the bottom center of the invert for the
Manhole Depth
.
9.
Verify or select the method through which you will
communicate with the monitor from the
Connect
drop-down
list.
Serial
Choose this option to perform direct, serial
communication with the monitor.
Note:
Always use
Serial
communications to perform the
initial monitor activation
or after a deactivation.
Wireless
Choose this for
monitors with SIMs
with static IP addresses for performing wireless
communication.
10.
(
applicable only to
Wireless
communications
) Enter the IP
address corresponding to the monitor in the
IP Address
field.
The field designation displayed depends on the method of
communication selected in the
Connect
field.
Содержание 507165
Страница 20: ...1 12 ADS TRITON Manual Control Drawing ...
Страница 27: ...Introduction 1 19 CS6 LRD Sensor Certificate of Conformity ...
Страница 29: ...Introduction 1 21 CSA Certificate of Compliance Page 1 of 7 ...
Страница 30: ...1 22 ADS TRITON Manual CSA Certificate of Compliance Page 2 of 7 ...
Страница 31: ...Introduction 1 23 CSA Certificate of Compliance Page 3 of 7 ...
Страница 32: ...1 24 ADS TRITON Manual CSA Certificate of Compliance Page 4 of 7 ...
Страница 33: ...Introduction 1 25 CSA Certificate of Compliance Page 5 of 7 ...
Страница 34: ...1 26 ADS TRITON Manual CSA Certificate of Compliance Page 6 of 7 ...
Страница 35: ...Introduction 1 27 CSA Certificate of Compliance Page 7 of 7 ...
Страница 37: ...Introduction 1 29 Sample TRITON Declaration of Conformity Page 2 ...
Страница 53: ...System Overview 2 13 ExPAC XBUS ...
Страница 266: ...5 60 ADS TRITON Manual z Installing the Submersion Sensor z Measuring the physical offset ...
Страница 288: ...5 82 ADS TRITON Manual Topside Wall Mount Bracket Topside Sensor Bracket ...
Страница 292: ...5 86 ADS TRITON Manual Confirm Level Front to Back Installed ParaDepth ParaFlow Wall Mount Bracket ...
Страница 315: ...External Power 6 9 Power supply firmly secured to the DIN rail Front view of power supply mounted to DIN rail ...
Страница 327: ...External Power 6 21 Wires exiting DC output terminal on power supply POWER SUPPLY DC OUTPUT TERMINAL CONNECTIONS ...
Страница 345: ...7 2 ADS TRITON Manual use of this installation guide or the installation of any ADS equipment ...
Страница 358: ...Inclinometer 8 3 ...
Страница 507: ...C 4 ADS TRITON Manual ...
Страница 535: ...Index In 19 wiring to the monitor 6 29 XIO device parameters 4 84 ...