
5-38 ADS
Manual
Special Installations for AV|Gated, AV|Max,
Peak Combo, Surface Combo, or Ultrasonic
Depth Sensors
A special installation requires two independent installations: one for
the Surface Combo Sensor or Ultrasonic Depth Sensor and one for
the Peak Combo or AV|Gated sensor.
Note:
Special installations do not involve spreader
mechanisms or rings. All hardware mounts directly to the
pipe surface with anchor bolts.
Performing a special installation involves the following process:
z
Gathering the parts and supplies
z
Gathering the tools and equipment
z
Mounting the AV|Gated, AV|Max or Peak Combo sensor
z
Mounting the ParaDepth, ParaFlow, Surface Combo or
Ultrasonic Depth Sensor
z
Securing the cables to the band
Before beginning the installation, conduct a thorough investigation
of hydraulic and other site conditions. The hydraulics of a site
directly affect the monitor’s ability to accurately measure flow
depth and velocity. In addition, measure the horizontal and vertical
pipe dimensions carefully. Even slightly inaccurate pipe
dimensions can significantly skew and misrepresent flow data.
Caution:
Handle all sensors and cables with extreme
care. The sensors and cables contain delicate mechanisms
and electronics. Keep sharp objects away from sensor
cables, and avoid stepping or placing heavy objects on the
cable during installation. Avoid contacting the metal
connector at the end of the Surface Combo or Ultrasonic
Depth Sensor cable (
or any other sharp object
) with the
Teflon-coated crystals on the sensor.
Содержание 507165
Страница 20: ...1 12 ADS TRITON Manual Control Drawing ...
Страница 27: ...Introduction 1 19 CS6 LRD Sensor Certificate of Conformity ...
Страница 29: ...Introduction 1 21 CSA Certificate of Compliance Page 1 of 7 ...
Страница 30: ...1 22 ADS TRITON Manual CSA Certificate of Compliance Page 2 of 7 ...
Страница 31: ...Introduction 1 23 CSA Certificate of Compliance Page 3 of 7 ...
Страница 32: ...1 24 ADS TRITON Manual CSA Certificate of Compliance Page 4 of 7 ...
Страница 33: ...Introduction 1 25 CSA Certificate of Compliance Page 5 of 7 ...
Страница 34: ...1 26 ADS TRITON Manual CSA Certificate of Compliance Page 6 of 7 ...
Страница 35: ...Introduction 1 27 CSA Certificate of Compliance Page 7 of 7 ...
Страница 37: ...Introduction 1 29 Sample TRITON Declaration of Conformity Page 2 ...
Страница 53: ...System Overview 2 13 ExPAC XBUS ...
Страница 266: ...5 60 ADS TRITON Manual z Installing the Submersion Sensor z Measuring the physical offset ...
Страница 288: ...5 82 ADS TRITON Manual Topside Wall Mount Bracket Topside Sensor Bracket ...
Страница 292: ...5 86 ADS TRITON Manual Confirm Level Front to Back Installed ParaDepth ParaFlow Wall Mount Bracket ...
Страница 315: ...External Power 6 9 Power supply firmly secured to the DIN rail Front view of power supply mounted to DIN rail ...
Страница 327: ...External Power 6 21 Wires exiting DC output terminal on power supply POWER SUPPLY DC OUTPUT TERMINAL CONNECTIONS ...
Страница 345: ...7 2 ADS TRITON Manual use of this installation guide or the installation of any ADS equipment ...
Страница 358: ...Inclinometer 8 3 ...
Страница 507: ...C 4 ADS TRITON Manual ...
Страница 535: ...Index In 19 wiring to the monitor 6 29 XIO device parameters 4 84 ...