
Index In-9
connecting ground wire, 6-29, 6-
34
connecting sensors, 5-97
connectors, 2-9
control drawing, 1-11
diagnostic codes, 11-6
direct connection, 3-22
estimated battery life, 11-9
EV-DO communication, 2-5
external DC power requirements,
6-3
external power, 6-1
fuses
replacement, 11-35
ground connection facility, 6-22,
6-23, 6-29, 6-34
HSPA+ communication, 2-5
indirect connection, 3-23
inspection, 11-3
installation, 7-1
manhole rim, 7-7
manhole wall, 7-4
rung, 7-3
LED window, 11-6
monitor activity codes, 11-6
memory, 2-2
Modbus configuration, 10-10
mounting bracket, 7-4
new product warranty, 1-30
on-site communication, 3-22, 3-23
out-of-warranty repairs, 1-31
overview, 2-5
ports, 2-9
power, 1-5
external, 6-1
processor board, 2-6
regulator
replacement, 11-35
replacing the fuses, 11-35
remote communication, 3-3
replacing the battery pack, 11-12
replacing the fuses, 11-35
replacing the regulator, 11-35
replacing the SIM card, 11-24
returns, 1-31
running sensor diagnostics, 4-92
securing the dryer tube, 5-99
shipping for warranty work, 1-31
specifications, A-1
supplying external power, 6-36
telemetry, 1-5
Telog Ru-33, D-2
testing cryout capability, 11-9
torque for bolts, 11-19, 11-33, 11-
41
troubleshooting, 11-45
troubleshooting fee, 1-31
Verizon wireless network services,
2-5, 3-3
voltage regulator board, 2-12
warranty, 1-30
wireless communication, 1-5, 2-5,
3-3
wiring to the ExPAC, 6-29
wiring to the XBUS, 6-29
wiring to the XIO, 6-29
monitor configuration
uploading, 11-5
Monitor Hardware Configuration
Uploading, 11-4, 11-5
mounting bracket for the monitor, 7-
4
mounting the monitor
manhole rim, 7-7
manhole wall, 7-4
rung, 7-3
N
new product warranty, 1-30
Notification, 4-21
O
obtaining
monitor configuration, 11-5
on-site communication, 3-22, 3-23
out-of-warranty repairs, 1-31
overview
Содержание 507165
Страница 20: ...1 12 ADS TRITON Manual Control Drawing ...
Страница 27: ...Introduction 1 19 CS6 LRD Sensor Certificate of Conformity ...
Страница 29: ...Introduction 1 21 CSA Certificate of Compliance Page 1 of 7 ...
Страница 30: ...1 22 ADS TRITON Manual CSA Certificate of Compliance Page 2 of 7 ...
Страница 31: ...Introduction 1 23 CSA Certificate of Compliance Page 3 of 7 ...
Страница 32: ...1 24 ADS TRITON Manual CSA Certificate of Compliance Page 4 of 7 ...
Страница 33: ...Introduction 1 25 CSA Certificate of Compliance Page 5 of 7 ...
Страница 34: ...1 26 ADS TRITON Manual CSA Certificate of Compliance Page 6 of 7 ...
Страница 35: ...Introduction 1 27 CSA Certificate of Compliance Page 7 of 7 ...
Страница 37: ...Introduction 1 29 Sample TRITON Declaration of Conformity Page 2 ...
Страница 53: ...System Overview 2 13 ExPAC XBUS ...
Страница 266: ...5 60 ADS TRITON Manual z Installing the Submersion Sensor z Measuring the physical offset ...
Страница 288: ...5 82 ADS TRITON Manual Topside Wall Mount Bracket Topside Sensor Bracket ...
Страница 292: ...5 86 ADS TRITON Manual Confirm Level Front to Back Installed ParaDepth ParaFlow Wall Mount Bracket ...
Страница 315: ...External Power 6 9 Power supply firmly secured to the DIN rail Front view of power supply mounted to DIN rail ...
Страница 327: ...External Power 6 21 Wires exiting DC output terminal on power supply POWER SUPPLY DC OUTPUT TERMINAL CONNECTIONS ...
Страница 345: ...7 2 ADS TRITON Manual use of this installation guide or the installation of any ADS equipment ...
Страница 358: ...Inclinometer 8 3 ...
Страница 507: ...C 4 ADS TRITON Manual ...
Страница 535: ...Index In 19 wiring to the monitor 6 29 XIO device parameters 4 84 ...