applicable only to monitors supporting Modbus and Telog
Ru-33 operations
) Click on the
Modbus
button and complete
the
Modbus Parameters
dialog in the following way:
Select the
Enable
checkbox.
Enter the slave address number in the
ID
field to be used
when facilitating communication between the
monitor/EMUX (FlowShark Triton) or
monitor/ExPAC/XBUS (ADS
/
and the third-
party system (e.g., a SCADA system, RTU, or process
control system). For
,
FlowShark Triton
and
FlowHawk
monitors, choose a number from 2 to 57, 59 to
96, or 98 to 247. For installations involving Telog RU-33,
ADS recommends using 1 as the ID.
Enter the amount of time, in milliseconds, following a
request you want the monitor to wait before returning the
requested data to the third-party system in the
Delay
Response
field. (This field typically does not need
editing.)
Click on the
OK
button.
12.
Select the
Save
button to save the current parameters on the
dialog to the local directory or network.
13.
Continue to enter the monitoring point information and assign
and edit the devices.
Configure the Monitoring Point(s)
The second step in configuring a monitor is entering the monitoring
point information. This involves designating the pipe
characteristics at the monitoring point and assigning and editing the
devices corresponding to the monitoring point.
The monitoring point represents the physical location at which the
sensors are installed. The sensors A monitor location can support
up to two monitoring points, and the settings must be designated for
each monitoring point.
Содержание 507165
Страница 20: ...1 12 ADS TRITON Manual Control Drawing ...
Страница 27: ...Introduction 1 19 CS6 LRD Sensor Certificate of Conformity ...
Страница 29: ...Introduction 1 21 CSA Certificate of Compliance Page 1 of 7 ...
Страница 30: ...1 22 ADS TRITON Manual CSA Certificate of Compliance Page 2 of 7 ...
Страница 31: ...Introduction 1 23 CSA Certificate of Compliance Page 3 of 7 ...
Страница 32: ...1 24 ADS TRITON Manual CSA Certificate of Compliance Page 4 of 7 ...
Страница 33: ...Introduction 1 25 CSA Certificate of Compliance Page 5 of 7 ...
Страница 34: ...1 26 ADS TRITON Manual CSA Certificate of Compliance Page 6 of 7 ...
Страница 35: ...Introduction 1 27 CSA Certificate of Compliance Page 7 of 7 ...
Страница 37: ...Introduction 1 29 Sample TRITON Declaration of Conformity Page 2 ...
Страница 53: ...System Overview 2 13 ExPAC XBUS ...
Страница 266: ...5 60 ADS TRITON Manual z Installing the Submersion Sensor z Measuring the physical offset ...
Страница 288: ...5 82 ADS TRITON Manual Topside Wall Mount Bracket Topside Sensor Bracket ...
Страница 292: ...5 86 ADS TRITON Manual Confirm Level Front to Back Installed ParaDepth ParaFlow Wall Mount Bracket ...
Страница 315: ...External Power 6 9 Power supply firmly secured to the DIN rail Front view of power supply mounted to DIN rail ...
Страница 327: ...External Power 6 21 Wires exiting DC output terminal on power supply POWER SUPPLY DC OUTPUT TERMINAL CONNECTIONS ...
Страница 345: ...7 2 ADS TRITON Manual use of this installation guide or the installation of any ADS equipment ...
Страница 358: ...Inclinometer 8 3 ...
Страница 507: ...C 4 ADS TRITON Manual ...
Страница 535: ...Index In 19 wiring to the monitor 6 29 XIO device parameters 4 84 ...