
Sensor Installation and Connection 5-99
6.
(
applicable only when performing water quality sampling
)
Connect the appropriate sampler cable to the
COMM + EXT
PWR
port. Tighten the rotating connector collar in a
clockwise direction until it clicks, and verify that it is seated
correctly.
7.
For locations exhibiting the presence of hydrogen sulfide
and/or high moisture, provide added protection by wrapping
the connection with mastic tape.
8.
Seal any unused connectors with protective caps. If
necessary, obtain additional caps from ADS.
Note:
An air valve is present in the monitor top. This
valve exists only for testing purposes during the
manufacturing process.
Do not attempt to fill the monitor
with air or pressurize the monitor!
Securing the Dryer Tube to the Monitor
The Peak Combo, AV|Gated, and Surface Combo sensors each
contain a pressure depth sensor with an associated dryer tube. For
each combo sensor connected to the monitor, you must secure the
corresponding dryer tube (attached to a cable running from the
sensor connector) to the monitor in the following way:
1.
Attach the dryer tube from the pressure depth sensor in the
vertical position to the monitor handle using cable ties. Make
sure the clear, flexible tubing coming from the sensor
connector to the top of the dryer tube is not kinked. If
necessary, use a loose cable tie to hold it in an unkinked
position.
Содержание 507165
Страница 20: ...1 12 ADS TRITON Manual Control Drawing ...
Страница 27: ...Introduction 1 19 CS6 LRD Sensor Certificate of Conformity ...
Страница 29: ...Introduction 1 21 CSA Certificate of Compliance Page 1 of 7 ...
Страница 30: ...1 22 ADS TRITON Manual CSA Certificate of Compliance Page 2 of 7 ...
Страница 31: ...Introduction 1 23 CSA Certificate of Compliance Page 3 of 7 ...
Страница 32: ...1 24 ADS TRITON Manual CSA Certificate of Compliance Page 4 of 7 ...
Страница 33: ...Introduction 1 25 CSA Certificate of Compliance Page 5 of 7 ...
Страница 34: ...1 26 ADS TRITON Manual CSA Certificate of Compliance Page 6 of 7 ...
Страница 35: ...Introduction 1 27 CSA Certificate of Compliance Page 7 of 7 ...
Страница 37: ...Introduction 1 29 Sample TRITON Declaration of Conformity Page 2 ...
Страница 53: ...System Overview 2 13 ExPAC XBUS ...
Страница 266: ...5 60 ADS TRITON Manual z Installing the Submersion Sensor z Measuring the physical offset ...
Страница 288: ...5 82 ADS TRITON Manual Topside Wall Mount Bracket Topside Sensor Bracket ...
Страница 292: ...5 86 ADS TRITON Manual Confirm Level Front to Back Installed ParaDepth ParaFlow Wall Mount Bracket ...
Страница 315: ...External Power 6 9 Power supply firmly secured to the DIN rail Front view of power supply mounted to DIN rail ...
Страница 327: ...External Power 6 21 Wires exiting DC output terminal on power supply POWER SUPPLY DC OUTPUT TERMINAL CONNECTIONS ...
Страница 345: ...7 2 ADS TRITON Manual use of this installation guide or the installation of any ADS equipment ...
Страница 358: ...Inclinometer 8 3 ...
Страница 507: ...C 4 ADS TRITON Manual ...
Страница 535: ...Index In 19 wiring to the monitor 6 29 XIO device parameters 4 84 ...