
Analog and Digital I/O 9-7
Determine whether too much load exists on the analog signal
in the following way:
Activate the monitor with the appropriate analog input
parameters.
Request for the owner to simulate a full-scale event that
generates a signal to 20mA while connected to the XIO
unit. Simulate the full-scale event through utilities in the
transmitter that supply the signal or, when using a depth
sensor, by placing a target under the sensor that will
provide a maximum reading. Magmeters usually have a
utility to drive the output to full scale. However, each
device is different and, in some applications, there is no
way to simulate maximum output. When this occurs,
calculate the load by measuring the voltage that drives the
loop and then measuring the resistance added by each
device on the loop. The owner
’
s instrumentation
representative should conduct this load calculation because
it requires toggling power to different devices and
disconnecting/reconnecting the signal and, possibly, power
wiring.
Using
Q
start
XML
, collect the data and verify that the analog
input values were correct during the simulated input time
interval.
Note:
If the load is too great and/or the analog signal is
controlling the customer equipment, a loop isolator must
be installed before proceeding.
Содержание 507165
Страница 20: ...1 12 ADS TRITON Manual Control Drawing ...
Страница 27: ...Introduction 1 19 CS6 LRD Sensor Certificate of Conformity ...
Страница 29: ...Introduction 1 21 CSA Certificate of Compliance Page 1 of 7 ...
Страница 30: ...1 22 ADS TRITON Manual CSA Certificate of Compliance Page 2 of 7 ...
Страница 31: ...Introduction 1 23 CSA Certificate of Compliance Page 3 of 7 ...
Страница 32: ...1 24 ADS TRITON Manual CSA Certificate of Compliance Page 4 of 7 ...
Страница 33: ...Introduction 1 25 CSA Certificate of Compliance Page 5 of 7 ...
Страница 34: ...1 26 ADS TRITON Manual CSA Certificate of Compliance Page 6 of 7 ...
Страница 35: ...Introduction 1 27 CSA Certificate of Compliance Page 7 of 7 ...
Страница 37: ...Introduction 1 29 Sample TRITON Declaration of Conformity Page 2 ...
Страница 53: ...System Overview 2 13 ExPAC XBUS ...
Страница 266: ...5 60 ADS TRITON Manual z Installing the Submersion Sensor z Measuring the physical offset ...
Страница 288: ...5 82 ADS TRITON Manual Topside Wall Mount Bracket Topside Sensor Bracket ...
Страница 292: ...5 86 ADS TRITON Manual Confirm Level Front to Back Installed ParaDepth ParaFlow Wall Mount Bracket ...
Страница 315: ...External Power 6 9 Power supply firmly secured to the DIN rail Front view of power supply mounted to DIN rail ...
Страница 327: ...External Power 6 21 Wires exiting DC output terminal on power supply POWER SUPPLY DC OUTPUT TERMINAL CONNECTIONS ...
Страница 345: ...7 2 ADS TRITON Manual use of this installation guide or the installation of any ADS equipment ...
Страница 358: ...Inclinometer 8 3 ...
Страница 507: ...C 4 ADS TRITON Manual ...
Страница 535: ...Index In 19 wiring to the monitor 6 29 XIO device parameters 4 84 ...