3. Install:
9
Pilot air screw
1
9
Throttle stop screw
2
*For EUROPE
**For AUS, NZ and ZA
4. Install:
9
Starter plunger
1
4-14
ENG
CARBURETOR AND REED VALVE
Pilot air screw:
1 turn out
*2-1/4 turns out
**1-1/4 turns out
(for reference only)
Note the following installation points:
9
Turn in the pilot air screw until it is lightly
seated.
9
Turn out the pilot air screw by the number of
turns recorded before removing.
5. Install:
9
Pilot jet
1
9
Main jet
2
6. Install:
9
Needle valve
1
9
Float
2
9
Float pin
3
NOTE:
9
After installing the needle valve to the float,
install them to the carburetor.
9
Check the float for smooth movement.
1P8-9-31-4A 5/12/05 1:18 PM Page 28
Summary of Contents for YZ250(V)
Page 78: ...2 11 MAINTENANCE SPECIFICATIONS SPEC MEMO...
Page 594: ...TUN MEMO...