4-6
ENG
RADIATOR
EC455000
ASSEMBLY AND INSTALLATION
EC445354
Radiator
1. Install:
9
Radiator breather hose
1
9
Radiator hose 2
2
To radiator (right)
3
.
2. Install:
9
Radiator (right)
1
9
Plain washer
2
9
Bolt [radiator (right)]
3
9
Radiator hose 4
4
Refer to “CABLE ROUTING DIAGRAM”
section in the CHAPTER 2.
10 Nm (1.0 m•kg, 7.2 ft•lb)
2 Nm (0.2 m•kg, 1.4 ft•lb)
2 Nm (0.2 m•kg, 1.4 ft•lb)
3. Install:
9
Radiator (left)
1
9
Plain washer
2
9
Bolt [radiator (left)]
3
9
Radiator hose 1
4
Refer to “CABLE ROUTING DIAGRAM”
section in the CHAPTER 2.
4. Tighten:
9
Clamp (radiator hose 2)
5
5. Install:
9
Panel
1
9
Bolt (panel)
2
NOTE:
Fit the hook
a
on the inner side first into the
radiator.
10 Nm (1.0 m•kg, 7.2 ft•lb)
2 Nm (0.2 m•kg, 1.4 ft•lb)
2 Nm (0.2 m•kg, 1.4 ft•lb)
10 Nm (1.0 m•kg, 7.2 ft•lb)
1P8-9-31-4A 5/12/05 1:18 PM Page 12
Summary of Contents for YZ250(V)
Page 78: ...2 11 MAINTENANCE SPECIFICATIONS SPEC MEMO...
Page 594: ...TUN MEMO...