2-16
CABLE ROUTING DIAGRAM
SPEC
1
Clamp
2
Wireharness
3
High tension cord
4
CDI unit band
5
CDI unit
6
CDI unit lead
7
Connector cover
8
Radiator hose
9
Radiator breather hose
0
CDI unit stay
A
Clamp the wireharness to the
right engine bracket.
B
Pass the high tension cord to
the right of the radiator hose so
that the high tension cord does
not contact the radiator hose.
C
Pass the CDI unit lead between
the frame and the radiator
(right) and then above the radia-
tor fitting boss.
D
Bring the connector cover into
contact with the coupler.
E
Pass the radiator breather hose
behind the radiator hose.
F
Insert the CDI unit band until it
stops at the CDI unit stay.
1P8-9-31-2 5/19/05 10:30 AM Page 58
Summary of Contents for YZ250(V)
Page 78: ...2 11 MAINTENANCE SPECIFICATIONS SPEC MEMO...
Page 594: ...TUN MEMO...