2-6
INSP
ADJ
COOLING SYSTEM
14. Inspect:
• Cooling system
Decrease of pressure (leaks)
→
Repair as
required.
Inspection steps:
• Attach the cooling system tester
1
and adapter
2
to the coolant filler
3
.
• Apply 100 kPa (1.0 kg/cm
2
, 14 psi).
• Measure the pressure with the gauge.
Cooling system tester:
90890-01325, YU-24460-01
Adapter:
90890-01352, YU-33984
1
2
3
Air bleeding
1. Remove:
• Rear bumper cover
1
2. Bleed air from the cooling system.
1
Air bleeding steps:
• Lift up the tail of the machine.
• Remove the bleed bolt
1
on the heat
exchanger.
• While slowly adding coolant to the coolant filler,
drain the coolant until no more air bubbles
appear.
• Tighten the bleed bolt
1
.
• Add coolant to the coolant cold level
a
.
T
R
.
.
Bleed bolt:
13 Nm (1.3 m · kg, 9.4 ft · lb)
1
Summary of Contents for RS90K
Page 2: ......
Page 8: ......
Page 65: ...INSP ADJ ...
Page 158: ...2 57 INSP ADJ CARBURETOR TUNING Guide for carburetion ...
Page 195: ...INSP ADJ ...
Page 659: ... ELEC ...
Page 721: ... ELEC ...
Page 816: ...9 33 SPEC CABLE ROUTING 1 7 2 3 4 6 5 A A A A ...
Page 824: ...9 41 SPEC CABLE ROUTING 3 J K I H G F E D C B A 0 9 8 7 4 5 6 2 1 ...
Page 826: ...9 43 SPEC CABLE ROUTING 3 J K I H G F E D C B A 0 9 8 7 4 5 6 2 1 ...
Page 828: ...9 45 SPEC CABLE ROUTING A B B 1 2 3 4 5 6 7 8 9 0 A B 9 C 0 D E G F B B A ...
Page 830: ...9 47 SPEC CABLE ROUTING 1 5 2 3 4 A B 6 5 7 8 9 0 A C A A B B B A A B ...
Page 832: ...9 49 SPEC CABLE ROUTING A A 7 1 2 3 4 6 5 ...
Page 834: ...9 51 SPEC CABLE ROUTING 1 2 3 4 5 6 7 5 B B A A 8 9 4 4 A A B B ...
Page 836: ......
Page 839: ......