![Yamaha RS90K Service Manual Download Page 100](http://html.mh-extra.com/html/yamaha/rs90k/rs90k_service-manual_901267100.webp)
2-29
INSP
ADJ
DRIVE V-BELT/ENGAGEMENT SPEED CHECK
6. Measure:
• Drive V-belt circumference
a
Out of specification
→
Replace.
V-belt circumference:
1,129 ~ 1,137 mm (44.4 ~ 44.8 in)
ENGAGEMENT SPEED CHECK
1. Place the machine on a level surface of hard-
packed snow.
2. Inspect:
• Clutch engagement speed
Inspection steps:
• Start the engine, and open the throttle lever
gradually.
• Check the engine speed when the machine
starts moving forward.
Out of specification
→
Adjust the primary
sheave.
Engagement speed:
RS90/RS90R:
3,300 ~ 3,700 r/min
RSG90:
3,400 ~ 3,800 r/min
RS90M:
3,800 ~ 4,200 r/min
RST90 “For USA/Canada”:
3,000 ~ 3,400 r/min
RST90 “For Europe”/RST90TF:
2,800 ~ 3,200 r/min
Summary of Contents for RS90K
Page 2: ......
Page 8: ......
Page 65: ...INSP ADJ ...
Page 158: ...2 57 INSP ADJ CARBURETOR TUNING Guide for carburetion ...
Page 195: ...INSP ADJ ...
Page 659: ... ELEC ...
Page 721: ... ELEC ...
Page 816: ...9 33 SPEC CABLE ROUTING 1 7 2 3 4 6 5 A A A A ...
Page 824: ...9 41 SPEC CABLE ROUTING 3 J K I H G F E D C B A 0 9 8 7 4 5 6 2 1 ...
Page 826: ...9 43 SPEC CABLE ROUTING 3 J K I H G F E D C B A 0 9 8 7 4 5 6 2 1 ...
Page 828: ...9 45 SPEC CABLE ROUTING A B B 1 2 3 4 5 6 7 8 9 0 A B 9 C 0 D E G F B B A ...
Page 830: ...9 47 SPEC CABLE ROUTING 1 5 2 3 4 A B 6 5 7 8 9 0 A C A A B B B A A B ...
Page 832: ...9 49 SPEC CABLE ROUTING A A 7 1 2 3 4 6 5 ...
Page 834: ...9 51 SPEC CABLE ROUTING 1 2 3 4 5 6 7 5 B B A A 8 9 4 4 A A B B ...
Page 836: ......
Page 839: ......