5-26
ENG
CYLINDER HEAD
INSTALLATION
1. Install:
• Dowel pins
1
• Gasket
2
1
2
1
New
New
2. Install:
• Cylinder head
NOTE:
Pass the timing chain through the timing chain cav-
ity.
3. Tighten:
• Cylinder head bolts (M10)
NOTE:
The tightening procedure of the cylinder head bolts
is angle controlled, therefore tighten the bolts using
the following procedure.
Tightening steps:
• Lubricate the cylinder head bolts and washers
with engine oil.
• Install the washers and cylinder head bolts.
• Tighten the cylinder head bolts in the proper
tightening sequence as shown.
• Loosen and retighten the cylinder head bolts in
the proper tightening sequence as shown.
T
R
.
.
Cylinder head bolt (M10):
1st:
25 Nm (2.5 m · kg, 18 ft · lb)
T
R
.
.
Cylinder head bolt (M10):
2nd:
25 Nm (2.5 m · kg, 18 ft · lb)
8
7
6
5
3
2
1
4
Summary of Contents for RS90K
Page 2: ......
Page 8: ......
Page 65: ...INSP ADJ ...
Page 158: ...2 57 INSP ADJ CARBURETOR TUNING Guide for carburetion ...
Page 195: ...INSP ADJ ...
Page 659: ... ELEC ...
Page 721: ... ELEC ...
Page 816: ...9 33 SPEC CABLE ROUTING 1 7 2 3 4 6 5 A A A A ...
Page 824: ...9 41 SPEC CABLE ROUTING 3 J K I H G F E D C B A 0 9 8 7 4 5 6 2 1 ...
Page 826: ...9 43 SPEC CABLE ROUTING 3 J K I H G F E D C B A 0 9 8 7 4 5 6 2 1 ...
Page 828: ...9 45 SPEC CABLE ROUTING A B B 1 2 3 4 5 6 7 8 9 0 A B 9 C 0 D E G F B B A ...
Page 830: ...9 47 SPEC CABLE ROUTING 1 5 2 3 4 A B 6 5 7 8 9 0 A C A A B B B A A B ...
Page 832: ...9 49 SPEC CABLE ROUTING A A 7 1 2 3 4 6 5 ...
Page 834: ...9 51 SPEC CABLE ROUTING 1 2 3 4 5 6 7 5 B B A A 8 9 4 4 A A B B ...
Page 836: ......
Page 839: ......