Chapter 3 Profibus DP
Manual VIPA System 200V
3-94
HB97E - IM - Rev. 06/29
To be compatible with the STEP
7 projecting tool from Siemens, you have
to execute the following steps for CPU 214 and DP master:
•
Start the Hardware configurator from Siemens
•
Install the GSD-file vipa_21x.gsd
•
Project a CPU 315-2DP with DP master (master address 2)
•
Add a Profibus slave
"VIPA_CPU21x"
with address 1.
•
Include a CPU
214-1BA02
at slot 0 of the slave system
•
Include the DP master 208-1DP01 (place holder) at slot 1 and include
the output module 222-1BF00 at slot 2.
•
Give the output module 222-1BF00 at slot 0.
To connect your real CPU 214DP, you have to execute the following steps
after including the GSD-file vipa04d5.gsd:
•
Add the Profibus slave
"VIPA_CPU2xxDP"
(address 3)
•
Include the "2 Byte Output" element at slot 0 and choose the output
address 20.
•
Include the "2 Byte Input" element at slot 1 and choose the input
address 10.
•
Save your project.
Engineering
CPU 214 of the
DP master
Profibus link-up of
the CPU 214DP
Summary of Contents for System 200V IM Series
Page 1: ...Manual VIPA System 200V IM Order No VIPA HB97E_IM Rev 06 29...
Page 2: ...Lerrzeichen...
Page 6: ...About this manual Manual VIPA System 200V Subject to change to cater for technical progress...
Page 10: ...Contents Manual VIPA System 200V iv HB97E IM Rev 06 29...
Page 18: ...Chapter 1 Basics Manual VIPA System 200V 1 6 HB97E IM Rev 06 29...
Page 136: ...Chapter 3 Profibus DP Manual VIPA System 200V 3 104 HB97E IM Rev 06 29...
Page 338: ...Chapter 8 Ethernet coupler Manual VIPA System 200V 8 34 HB97E IM Rev 06 29...
Page 344: ...Chapter 9 Bus expansion modules IM 260 IM 261 Manual VIPA System 200V 9 6 HB97E IM Rev 06 29...