November, 2003
455 D Control
Panel Installation
Instructions
CONTENTS
General Description
2
Installing the 455 D Control Panel
2
Connect the Main Power Supply
2
Connect the Operator(s) to the Control Panel
3
Check the Motor’s Direction of Rotation
3
Connect Other Devices
4
Set Other Operating Controls
6
Programming 8
Learning of Operating Times
10
Learning of Normal Times
10
Learning Times with Gatecoder
10
Automated System Test
11
Logic Tables of 455 D Control Panel
12
Safety in Gate Design
14
Maintenance 14
Limited Warranty
16
T
H E
4 5 5 D C
O N T R O L
P
A N E L
:
S
U P P L E M E N T A L
I
N S T A L L A T I O N
I
N S T R U C T I O N S
FAAC International, Inc.
303 Lexington Avenue
Cheyenne, WY 82007
www.faacusa.com
Note
: These instructions supplement the
installation manual for your operator. Be
sure to review all safety information in the
installation manual for your operator.