Frequency inverters with Control Units CU230P-2 HVAC, CU230P-2 DP, CU230P-2 CAN
Operating Instructions, 01/2011, FW 4.4, A5E02430659B AD
85
Adapting the terminal strip
5
5.1
Preconditions
Before you adapt the inputs and outputs of the inverter, you should have completed the
basic commissioning, see Chapter Commissioning (Page 53) .
In the basic commissioning, select an assignment of the inverter interfaces from several
predefined configurations, see Section Preparing for commissioning (Page 56).
If none of the predefined configurations completely matches your application, then you must
adapt the assignment of the individual inputs and outputs. You do this by changing the
internal interconnection of an input or output using BICO technology (Page 16).
8
,
8
,
7(03
7(03
,
',
',
',
',
',
',
'21&
'212
'2&20
'212
'2&20
$2
*1'
*1'
r0722.0
BO: ryyxx.n
r0722.1
r0722.2
r0722.3
r0722.4
r0722.5
CO: rxxyy
p0771[0]
$2
p0771[1]
p0731
p0730
'21&
'212
'2&20
p0732
BI: pxxxx
$,
$,
r0755[0]
CI: pyyyy
p0756[0]
r0755[1]
p0756[1]
p0776[0]
p0776[1]
$,
$,
$,
*1'
r0755[2]
p0756[2]
r0755[3]
p0756[3]
$,
*1'
Figure 5-1
Internal interconnection of the inputs and outputs